design process study for the demonstration homes - Architectural ...
design process study for the demonstration homes - Architectural ...
design process study for the demonstration homes - Architectural ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Prepared By:<br />
<strong>Architectural</strong> Energy Corporation<br />
Judie Porter<br />
Boulder, Colorado<br />
Contract No. 500-04-024<br />
Work Authorization No. (if applicable)<br />
ConSol<br />
Steve Vang, Project Manager<br />
Stockton, Cali<strong>for</strong>nia<br />
Prepared For:<br />
Cali<strong>for</strong>nia Energy Commission<br />
Public Interest Energy Research (PIER) Program<br />
Cheri Davis,<br />
Contract Manager<br />
Ann Peterson,<br />
Building End-Use Energy Efficiency Program<br />
Manager<br />
Nancy Jenkins,<br />
Office Manager<br />
ENERGY EFFICIENCY RESEARCH OFFICE<br />
Martha Krebs, Ph.D.,<br />
Deputy Director<br />
ENERGY RESEARCH AND DEVELOPMENT<br />
DIVISION<br />
B. B. Blevins,<br />
Executive Director<br />
DISCLAIMER<br />
This report was prepared as <strong>the</strong> result of work sponsored by <strong>the</strong><br />
Cali<strong>for</strong>nia Energy Commission. It does not necessarily represent<br />
<strong>the</strong> views of <strong>the</strong> Energy Commission, its employees or <strong>the</strong> State<br />
of Cali<strong>for</strong>nia. The Energy Commission, <strong>the</strong> State of Cali<strong>for</strong>nia, its<br />
employees, contractors and subcontractors make no warrant,<br />
express or implied, and assume no legal liability <strong>for</strong> <strong>the</strong><br />
in<strong>for</strong>mation in this report; nor does any party represent that <strong>the</strong><br />
uses of this in<strong>for</strong>mation will not infringe upon privately owned<br />
rights. This report has not been approved or disapproved by <strong>the</strong><br />
Cali<strong>for</strong>nia Energy Commission nor has <strong>the</strong> Cali<strong>for</strong>nia Energy<br />
Commission passed upon <strong>the</strong> accuracy or adequacy of <strong>the</strong><br />
in<strong>for</strong>mation in this report.