Hydropower Development<br />
Programme<br />
In addition to the new agreement for Phase<br />
III of the institutional cooperation, a new<br />
second programme was initiated in <strong>2008</strong><br />
with a budget of NOK 15 million over three<br />
years. The programme will give support to<br />
the Government of Bhutan’s Accelerated<br />
Hydropower Development Programme through<br />
the following key activities:<br />
Project Finance and Power Sales Agreements<br />
Reconnaissance surveys for remaining<br />
listed hydropower project sites under the<br />
Power System Master Plan<br />
Prefeasibility Studies of project sites<br />
including Environmental Studies<br />
Detailed Project <strong>Report</strong> and Environmental<br />
Study of one hydropower project site<br />
Much of the available budget is expected to<br />
be used to finance the reconnaissance surveys<br />
and prefeasibility study of hydropower sites<br />
which will be carried out by the Department<br />
of Energy with external consultants under<br />
the assistance of <strong>NVE</strong>.<br />
The Detailed Project <strong>Report</strong> and Environmental<br />
Study of one project will be done as part of a<br />
planned two year extension of the programme<br />
should funds be made available.<br />
Contact: David A. Wright<br />
AChiEVEMENt<br />
Consultant procurement arrangements<br />
prepared and elaborated in cooperation<br />
between Department of Energy and <strong>NVE</strong><br />
A NNUA L R EPORT <strong>2008</strong> 1<br />
<strong>NVE</strong> hydrologists at Wangdue Phodrang Flood<br />
Warning Station<br />
Bhutan