20 A NNUA L R EPORT <strong>2008</strong><br />
Nepal<br />
Department of Electricity<br />
Development (DoED)<br />
The contract agreement on institutional<br />
cooperation between Department of Electricity<br />
Development (DoED) and <strong>NVE</strong> was signed in<br />
December 2004. Norway has agreed to provide<br />
financial support for the implementation<br />
of feasibility studies of small and medium<br />
size hydropower projects in Nepal, based<br />
upon the precondition that the studies shall<br />
be undertaken by Nepalese consultant<br />
companies on the basis of competitive bidding.<br />
The studies are split into three packages, and<br />
will be conducted successively.<br />
<strong>NVE</strong> participates in the evaluation of the<br />
consultants’ proposals, and comments on<br />
their feasibility studies. The main objective<br />
is to encourage investments in hydropower<br />
projects in Nepal. Another important objective<br />
is to increase the competence of Nepalese<br />
consultants and water resources authorities<br />
in undertaking projects in order to obtain<br />
required quality for licence and financing.<br />
The implementation of each feasibility study<br />
includes preparation of an inception report,<br />
a field report, an interim/progress report,<br />
a draft final report and a final report,<br />
in addition to an environmental impact<br />
assessment (EIA).<br />
AChiEVEMENts<br />
NEPAL<br />
Capital: Kathmandu<br />
GDP (10 9 USD): $12.64<br />
Population: 29.5 million<br />
Total installed capacity: 557 MW<br />
Main Energy Sector Authorities:<br />
Department of Electricity Development<br />
Nepal Electricity Authority<br />
There has been delays in the deliverables for<br />
all feasibility studies.<br />
Contact: Kjell Erik Stensby, kest@nve.no<br />
Three draft feasibility studies (Package 1)<br />
were finalized according to international<br />
standards, suggesting a total potential<br />
of 38.5 MW<br />
The feasibility studies for three projects<br />
(Package 2) have been initiated, and two<br />
inception reports have been prepared