8 A NNUA L R EPORT <strong>2008</strong><br />

Ethiopia<br />

Ministry of Water<br />

Resources<br />

<strong>NVE</strong> was engaged by NORAD to assist the<br />

Ministry of Water Resources in Ethiopia with<br />

formulation of the study of the feasibility<br />

of the Mandaya and Beko Abo Multipurpose<br />

projects on the Blue Nile in Ethiopia.<br />

These large strategic projects will be of<br />

regional importance and have the potential<br />

of providing long-term benefits to the entire<br />

region. Both projects include hydropower<br />

stations with more than 2000MW installed<br />

capacity and large reservoirs which will<br />

provide possibilities for increasing water<br />

availability for downstream uses such as<br />

irrigation as well as reducing the sediment<br />

flows and siltation problems downstream.<br />

Due to the regional importance of the<br />

projects efforts are being made to involve<br />

all regional stakeholders and a regional<br />

conference was held to discuss the draft<br />

Terms of Reference for the projects in<br />

Nazareth in Ethiopia in November <strong>2008</strong>. Both<br />

NORAD and the Royal Norwegian Embassy<br />

in Addis Ababa attended the conference as<br />

well as officials and other stakeholders from<br />

Ethiopia, Sudan, the World Bank and other<br />

institutions, and <strong>NVE</strong>. The tender process for<br />

the feasibility studies for Mandaya and Beko<br />

Abo projects is scheduled for mid 2009.<br />

Due to the lack of physical measurements<br />

and data of sediment loads in the river,<br />

NORAD commissioned <strong>NVE</strong> to carry out a<br />

sediment and hydrological measurement<br />

campaign during the <strong>2008</strong> flood season.<br />

<strong>NVE</strong> was able to muster a qualified team<br />

of hydrologists and sediment experts at<br />

short notice during the Norwegian annual<br />

vacations. Measuring equipment was<br />

procured and the campaign was carried out<br />

together with the Hydrology Department of<br />

the Ministry of Water Resources.<br />

Contact: David A. Wright<br />

AChiEVEMENts<br />

Capital: Addis Ababa<br />

ETHIOPIA<br />

GDP (10 9 USD): $25.08<br />

Population: 82.5 million<br />

Total installed capacity: 1 000 MW<br />

Main Energy Sector Authorities: Ethiopian<br />

Ministry of Water Resources (MOWR)<br />

Water level gauge<br />

Valuable new sediment and flood data secured, which will contribute to the data base for the<br />

study and development of the multipurpose projects (improved reliability and quality of the<br />

data base)<br />

For the Mandaya and Beko Abo Feasibility studies Terms of Reference and other documents<br />

for procurement of consulting services has been jointly developed, elaborated and completed<br />

during regional stakeholder meeting which will contribute to the regional acceptance and<br />

success of the projects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!