8 A NNUA L R EPORT <strong>2008</strong><br />
Ethiopia<br />
Ministry of Water<br />
Resources<br />
<strong>NVE</strong> was engaged by NORAD to assist the<br />
Ministry of Water Resources in Ethiopia with<br />
formulation of the study of the feasibility<br />
of the Mandaya and Beko Abo Multipurpose<br />
projects on the Blue Nile in Ethiopia.<br />
These large strategic projects will be of<br />
regional importance and have the potential<br />
of providing long-term benefits to the entire<br />
region. Both projects include hydropower<br />
stations with more than 2000MW installed<br />
capacity and large reservoirs which will<br />
provide possibilities for increasing water<br />
availability for downstream uses such as<br />
irrigation as well as reducing the sediment<br />
flows and siltation problems downstream.<br />
Due to the regional importance of the<br />
projects efforts are being made to involve<br />
all regional stakeholders and a regional<br />
conference was held to discuss the draft<br />
Terms of Reference for the projects in<br />
Nazareth in Ethiopia in November <strong>2008</strong>. Both<br />
NORAD and the Royal Norwegian Embassy<br />
in Addis Ababa attended the conference as<br />
well as officials and other stakeholders from<br />
Ethiopia, Sudan, the World Bank and other<br />
institutions, and <strong>NVE</strong>. The tender process for<br />
the feasibility studies for Mandaya and Beko<br />
Abo projects is scheduled for mid 2009.<br />
Due to the lack of physical measurements<br />
and data of sediment loads in the river,<br />
NORAD commissioned <strong>NVE</strong> to carry out a<br />
sediment and hydrological measurement<br />
campaign during the <strong>2008</strong> flood season.<br />
<strong>NVE</strong> was able to muster a qualified team<br />
of hydrologists and sediment experts at<br />
short notice during the Norwegian annual<br />
vacations. Measuring equipment was<br />
procured and the campaign was carried out<br />
together with the Hydrology Department of<br />
the Ministry of Water Resources.<br />
Contact: David A. Wright<br />
AChiEVEMENts<br />
Capital: Addis Ababa<br />
ETHIOPIA<br />
GDP (10 9 USD): $25.08<br />
Population: 82.5 million<br />
Total installed capacity: 1 000 MW<br />
Main Energy Sector Authorities: Ethiopian<br />
Ministry of Water Resources (MOWR)<br />
Water level gauge<br />
Valuable new sediment and flood data secured, which will contribute to the data base for the<br />
study and development of the multipurpose projects (improved reliability and quality of the<br />
data base)<br />
For the Mandaya and Beko Abo Feasibility studies Terms of Reference and other documents<br />
for procurement of consulting services has been jointly developed, elaborated and completed<br />
during regional stakeholder meeting which will contribute to the regional acceptance and<br />
success of the projects