2009 MANAGEMENT REPORT<br />

As defined by Aneel, this adjustment also considered the percentage difference in view of the<br />

definitive approval of <strong>EDP</strong> Escelsa's tariff review occurred on July 28, 2009.<br />

<strong>EDP</strong> B<strong>and</strong>eirante - At the public meeting held on October 21, 2008, Aneel approved the average<br />

adjustment of <strong>EDP</strong> B<strong>and</strong>eirante's tariff from 5.46% for the period from October 23, 2009 to October<br />

22, 2010, where 3.11% refers to the eco<strong>no</strong>mic annual tariff adjustment <strong>and</strong> 2.35% refers to<br />

financial items, which, including the effect of the financial items withdrawn from the basis, of<br />

4.44%, correspond to an average effect to be perceived by captive consumers of 1.02%.<br />

As defined by Aneel, this adjustment also included the percentage difference in view of the<br />

definitive approval of <strong>EDP</strong> B<strong>and</strong>eirante's tariff review occurred on October 6, 2009.<br />

AUCTIONS<br />

On August 27, 2009, Auction A-3 was carried out, which sold only average 11 MW at average sale<br />

price of R$ 144.5/MWh. Energy of two power plants, a PCH <strong>and</strong> a thermal sugarcane power plant,<br />

was negotiated. Of the total amount sold, only average 1 MW refers to hydric source, derived from<br />

the expansion of PCH Rio Bonito, in Santa Maria da Vitória river, ES. There was <strong>no</strong> negative<br />

goodwill <strong>and</strong> the PCH's energy was sold at R$ 144/MW, under a 30-year agreement. The thermal<br />

power plant winner of the auction was UTE Co<strong>do</strong>ra, which sold energy with ICB (cost-benefit rate)<br />

of R$ 144.60/MWh, for 15 years.<br />

On December 8, 2009, the Ministry of Mines <strong>and</strong> Energy - MME decided to cancel Auction A-5,<br />

scheduled for December 21, 2009. According to the MME, the cancellation was due to the failure<br />

to obtain, within the period required for the auction, the previous environmental license for granting<br />

of concession for operation of seven hydroelectric resources, totaling 905 MW of installed power.<br />

In addition, it was <strong>no</strong>ted that the dem<strong>and</strong> to the market of the distributors, as of 2014, was <strong>no</strong>t<br />

significant, <strong>and</strong> could be covered by the energy to be contracted in Auction A-3 of 2011.<br />

On December 14, 2009, the first auction exclusively of wind power was conducted, valid for 20<br />

years, commencing on July 1, 2012. 753 lots of 1 megawatt (MW) were negotiated at the average<br />

price of R$ 148.39 MWh. The 71 winning projects will be installed in Sergipe, Ceará, Rio Gr<strong>and</strong>e<br />

<strong>do</strong> Norte, Bahia <strong>and</strong> Rio Gr<strong>and</strong>e <strong>do</strong> Sul.<br />

ALTERATIONS OF A CORPORATE NATURE<br />

CENAEEL – On February 2009, <strong>EDP</strong> Re<strong>no</strong>váveis <strong>Brasil</strong> S.A., of which 45% is held by the Company,<br />

concluded the acquisition of Cenaeel, holder of the wind turbine farms of Água Doce (9.0 MW) <strong>and</strong><br />

Horizonte (4.8 MW), located in the State of Santa Catarina.<br />

ESC 90 – On June 2009, the sale of all the quotas of ESC 90 Telecomunicações Ltda. to Net<br />

Serviços de Comunicação S.A<br />

ELEBRÁS - In July 2009, it was concluded the acquisition of Elebrás Projetos Ltda., which holds<br />

several wind projects in Rio Gr<strong>and</strong>e <strong>do</strong> Sul.<br />

INVESTCO/LAJEADO - In November 2009, it was concluded the corporate reorganization of<br />

Tocantins Energia S.A, <strong>EDP</strong> Lajea<strong>do</strong> Energia S.A. <strong>and</strong> Lajea<strong>do</strong> Energia S.A. ("Tocantins", "<strong>EDP</strong><br />

Lajea<strong>do</strong>" <strong>and</strong> "Lajea<strong>do</strong> Energia", respectively). The purpose was to allow the rationalization <strong>and</strong><br />

simplification of the corporate structure <strong>and</strong> activities of <strong>EDP</strong> Lajea<strong>do</strong> <strong>and</strong> Lajea<strong>do</strong> Energia, also in<br />

view of the conduction of business <strong>and</strong> management of assets of the common invested company,<br />

Investco, bringing administrative, eco<strong>no</strong>mic <strong>and</strong> financial benefits, reduction of expenses <strong>and</strong><br />

combined operating expenses <strong>and</strong> improved cash flow. As a result, the ownership interest directly<br />

held by <strong>EDP</strong> Lajea<strong>do</strong> <strong>and</strong> Lajea<strong>do</strong> Energia in Investco were held exclusively by Lajea<strong>do</strong> Energia.