12.07.2015 Views

2010 Rail Manual - Dye Paintball

2010 Rail Manual - Dye Paintball

2010 Rail Manual - Dye Paintball

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AIRPORTASSEMBLY AND MAINTENANCEON/OFF AIRPORTASSEMBLY AND MAINTENANCEAIRPORTADJUSTMENT ANDMAINTENANCEThe location of theairport adapter canbe movedapproximately 1 1 ⁄4”back or forward fromthe stock position tofit your individualpreference.The Ultralite framecomes equipped withan integrated lockingdovetail. There is alocking screw locatedon the bottom rightside of the Ultraliteframe. It can be accessed with a 1 ⁄8" allen key through a hole in the grip panel. To unlock a partattached to the dovetail of the frame, turn the locking screw counterclockwise one full turn andslide the part off the dovetail. To attach a part to the dovetail, slide the part on and turn thelocking screw clockwise until part is firmly locked in place.ON/OFF AIRPORTThe RAIL comes equipped with an On/OffAirport attached to the bottom of the frame. Toturn on the gas supply, twist the ON/OFF knobclockwise, all the way in. To turn off the gassupply, twist the ON/OFF knobcounterclockwise, all the way out. As you turnthe knob out, the residual gas between theHyper3 and the ON/OFF airport is vented.When screwing the air system into the airport,always check that the threads on the air systemand the airport are clean and not worn out. Ifyou think the threads are not in good condition,contact DYE Precision or a professional storebefore screwing in the air system.22 23W W W . P R O T O P A I N T B A L L . C O MW W W . P R O T O P A I N T B A L L . C O M

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!