12.07.2015 Views

SolarEdge Installation Guide for Three Phase Inverters - Solco Solar ...

SolarEdge Installation Guide for Three Phase Inverters - Solco Solar ...

SolarEdge Installation Guide for Three Phase Inverters - Solco Solar ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Inverter User Interface<strong><strong>Solar</strong>Edge</strong> <strong>Installation</strong> <strong>Guide</strong> <strong>for</strong> <strong>Three</strong> <strong>Phase</strong> <strong>Inverters</strong> – EU – MAN-01-00016-1.564• P_OK XXX/YYY: Indicates a functioning DC line-communicationconnection to the <strong><strong>Solar</strong>Edge</strong> power optimizers, which indicates thattelemetry in<strong>for</strong>mation was received within the last 10 minutes. XXX isthe number of paired power optimizers <strong>for</strong> which telemetries have beenreceived by the inverter in the last two hours. YYY is the number ofpaired power optimizers identified during the most recent pairingprocess. Both XXX and YYY should be the same. If they are not, itmay indicate an access issue or pairing requirement that require yourattention.• S_OK: Indicates a functioning connection to the <strong><strong>Solar</strong>Edge</strong> MonitoringServer, which was validated during the last two minutes. Thisconnection is not mandatory <strong>for</strong> power generation.• ON/OFF: Indicates the position of the inverter ON/OFF Switch.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!