12.07.2015 Views

VRIOGS 010.3 RevA - Public Transport Victoria

VRIOGS 010.3 RevA - Public Transport Victoria

VRIOGS 010.3 RevA - Public Transport Victoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>VRIOGS</strong> <strong>010.3</strong> Revision A 21The designer shall however make provision for the future installation of ElectrolysisMitigation Equipment in the design.8.5.2 ELECTROLYSIS MITIGATION CUBICLEThe Electrolysis Mitigation Cubicle is designed and installed by one of theDepartment’s Representatives. To enable the installation of electrolysis mitigationequipment in the Substation, the designer shall make the following provisions in thedesign.a) Provision for freestanding type cubicle with minimum internal dimensions of1000mm wide, 800mm deep and 2000mm high. The cubicle will have frontaccess by a full height door. The designer shall obtain the most currentdrawing for this cubicle from the Department.b) The cubicle shall be located either in the HV switch room or in the amenitiesarea. As the Electrolysis Mitigation Equipment is not normally serviced by theSubstation staff of the Department, it shall be located in an area well clear ofoperational HV equipment.c) 32A, 240-230 volt AC power supply from MCCB F438 and F439 onswitchboard shall be provided in the design.d) Provisions shall be made for SCADA control and indication of the ElectrolysisMitigation Equipment.e) Connection of potential leads to the shunt on the negative bus.f) Provision of an appropriate number of 100mm P.V.C. conduits between thisequipment and the track side of the substation.g) Installation of an electrolysis drainage bus bar to enable connection ofelectrolysis feeders.h) Interconnecting cables between the E.M.E. and above busbars.8.6 METERING REQUIREMENTAC supply is taken from the Electrical Network Operator and sometimes, thedepartment's feeders, either aerially or underground, usually at 22kV, 3 phase, 50Hz.Power metering is to be installed as per the Electrical Network Operatorsrequirements 7 .The designer shall provide the designs for the following:Electrical Network Operator requirement.a) A metering cubicle, in accordance with the <strong>Victoria</strong>n Service & Installationrules.7 Refer to the <strong>Victoria</strong>n Service and Installation Rules.NOTE:This document is controlled only when viewed on the DOT Engineering Standards website.Any other copy of this document is uncontrolled, and the content may not be current.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!