<strong>VRIOGS</strong> <strong>010.3</strong> Revision A 238.7.3 EMERGENCY LIGHTINGEmergency route lighting and signage shall comply with AS 2293.Emergency lighting shall be provided with an illumination level of at least 20 Luxsufficient to allow staff to move safely to exit doors after loss of normal lighting. Suchlighting should only be activated if normal lighting has been switched on and thesupply to the normal lighting has subsequently been lost.The Emergency lamps shall be powered by the battery system. The batteries shallnot run dry if the normal lighting has inadvertently been left on.Escape route lighting shall be provided to show clearly and unambiguously theemergency escape path out of the substation building.8.7.4 EMERGENCY SIGNAGEThe escape route signage shall be Photo-Luminescent signage that complies withAS 2293.Escape route signage shall be provided to show clearly and unambiguously theemergency escape path out of the substation buildingEscape route signage shall direct personnel to areas outside the building that ispreferably not locked off or to any area that the personnel is authorised to enter.See section 7.5.1 for access authorisation requirements.8.7.5 POWER OUTLET REQUIREMENTS SHALL INCLUDE.a) GPO outlets of sufficient quantity and located to allow ease ofconstruction and maintenance works.b) A special heavy current power outlet shall be provided in a suitablelocation for operating transformer oil filtering equipment. The outletshall be compatible with the electrical characteristics and physicalconnection of the oil filtration equipment.c) Residual Current Devices shall be used in areas that may become wetsuch as the amenities area or close to the substation entries.8.7.6 LIGHT & POWER SCHEDULESA schedule for Light and Power shall be provided which shall be read in conjunctionwith the light and power layout drawing. All lights, light switches, power points shallbe numbered. The schedule shall detail the light number, switch type, wattage,location, mounting details, cable size and type and supply MCCB numbers.NOTE:This document is controlled only when viewed on the DOT Engineering Standards website.Any other copy of this document is uncontrolled, and the content may not be current.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!