12.07.2015 Views

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13(a)(b)an extension of time under Sub-Clause 7.3; andthe amount of any additional Cost due to such conditions.4.5 ProgrammeThe Supplier shall submit to the Purchaser, for <strong>in</strong>formation, with<strong>in</strong> 30 days of theEffective Date the Programme which shall conta<strong>in</strong> the order <strong>in</strong> which the Supplierproposes to carry out the Services (<strong>in</strong>clud<strong>in</strong>g each stage of design, delivery to Site,<strong>in</strong>stallation, test<strong>in</strong>g and commission<strong>in</strong>g of the Facility). The Supplier may amendsuch Programme from time to time and shall notify the Purchaser of any suchamendment as soon as practicable.4.6 Progress ReportsThe Supplier shall provide dur<strong>in</strong>g the Contract Period the reports set out <strong>in</strong> Schedule2.4.7 FossilsAll fossils, co<strong>in</strong>s, articles of value or antiquity, and structures and other rema<strong>in</strong>s orth<strong>in</strong>gs of geological or archaeological <strong>in</strong>terest or other relevant obstructions such asunexploded munitions discovered on the Site shall (as between the Parties) be theproperty of the Purchaser. The Supplier shall take reasonable precautions to preventhis staff, labour or other persons from remov<strong>in</strong>g or damag<strong>in</strong>g any such article orth<strong>in</strong>g. The Supplier shall, immediately upon discovery of such article or th<strong>in</strong>g, advisethe Purchaser, who may issue <strong>in</strong>structions for deal<strong>in</strong>g with it.If the Supplier suffers delay and/or <strong>in</strong>curs Cost aris<strong>in</strong>g from or <strong>in</strong> connection withsuch article or th<strong>in</strong>g or <strong>in</strong> follow<strong>in</strong>g these <strong>in</strong>structions of the Purchaser and if suchdelay and/or Cost was not (by the Base Date) foreseeable by an experiencedcontractor from the <strong>in</strong>formation provided by the Purchaser <strong>in</strong> accordance with Sub-Clause 4.3, the Supplier shall be entitled to:(a)(b)any extension of time under Sub-Clause 7.3; andthe amount of any additional Cost due to such conditions.4.8 Release from ObligationsThe Supplier shall be relieved of its obligation to perform the Services to the standardset out <strong>in</strong> Sub-Clause 4.1 to the extent delivery of Services is impeded, prevented ordelayed by a Purchaser's Risk event, as set out <strong>in</strong> Sub-Clause 17.3.5. DESIGN5.1 General ObligationsSubject to the provisions of this Contract, the Supplier shall carry out, and beresponsible for, the design of the Facility <strong>in</strong> accordance with the TechnicalSpecification. The Supplier holds himself, his designers and design Subcontractors ashav<strong>in</strong>g the experience and capability necessary for the design.<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!