12.07.2015 Views

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

145.2 Facility DocumentsThe Supplier shall prepare Facility Documents <strong>in</strong> sufficient detail to satisfy allregulatory approvals. Errors, omissions, ambiguities, <strong>in</strong>consistencies, <strong>in</strong>adequaciesand other defects shall be rectified by the Supplier at his cost.5.3 Technical Standards and RegulationsSubject to the provisions of this Contract, the design, the Facility Documents, theexecution and the <strong>in</strong>stalled Facility shall comply with English specifications, technicalstandards, <strong>build</strong><strong>in</strong>g, construction and environmental regulations, regulationsapplicable to the Facility, and the standards specified <strong>in</strong> the Technical Specification,or def<strong>in</strong>ed by relevant law. References <strong>in</strong> the Contract to such specifications,regulations, laws and other matters shall be understood to be references to the sameapplicable on the Base Date, unless stated otherwise. If substantially changed or newapplicable national specifications, technical standards, regulations or laws come <strong>in</strong>toforce after the Base Date, the Supplier shall submit proposals for compliance to thePurchaser. In the event that such proposals constitute a Variation, a Variation shall be<strong>in</strong>itiated <strong>in</strong> accordance with Clause 14.6. PLANT, MATERIALS AND WORKMANSHIP6.1 Manner of ExecutionAll <strong>Plant</strong> and Materials to be supplied shall be manufactured, and all work to be doneshall be executed <strong>in</strong> accordance with the Technical Specification <strong>in</strong> a proper andworkmanlike manner, with properly equipped facilities and non-hazardous materials,and <strong>in</strong> accordance with recognised good eng<strong>in</strong>eer<strong>in</strong>g practice.6.2 InspectionThe Supplier will carry out <strong>in</strong>spections of the materials and workmanship andprogress of <strong>Plant</strong> and Materials to be supplied under the Contract <strong>in</strong> accordance withthe quality plan to be prepared by the Supplier.7. COMMENCEMENT AND DELAYS7.1 Commencement of ServicesThe Supplier shall commence the [design/procurement] and <strong>in</strong>stallation of the Facilityas soon as is reasonably practicable after the Effective Date. The Supplier shall thenproceed with the Services with due expedition and without delay.7.2 Time for CompletionThe Facility shall have passed the Performance Tests by the Time for Completion.7.3 Extension of Time for CompletionThe Supplier is entitled to an extension of the Time for Completion (and acorrespond<strong>in</strong>g extension of the Expiry Date) if he is or will be delayed either beforeor after the Time for Completion by any of the follow<strong>in</strong>g causes:<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!