12.07.2015 Views

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)any default or delay by a statutory authority, undertaker or utility <strong>in</strong> the issueor extension of a Permit or carry<strong>in</strong>g out or provision of works or services thatit is bound to carry out or provide or any failure or shortage of power, fuel ortransport;any act or omission of any political or governmental agency or body, anywithdrawal of a Permit or the failure by a political, governmental or regulatoryagency to renew a Permit;an Emergency;loss or damage due to the use or occupation by the Purchaser or a third party<strong>in</strong> the control of the Purchaser (<strong>in</strong>clud<strong>in</strong>g Utilities) of any part of the Site orthe Facility, except as may be provided for <strong>in</strong> the Contract;any operation of the forces of nature aga<strong>in</strong>st which an experienced contractoror operator could not reasonably have been expected to take precautions;changes <strong>in</strong> Applicable Law which came <strong>in</strong>to force after the Base Date;any act, omission or default by the Purchaser;any failure of Utilities or failure by the Purchaser which causes the reductionor suspension of such services;failure by the Purchaser to procure or ma<strong>in</strong>ta<strong>in</strong> Permits <strong>in</strong> accordance withClause 1.9;environmental contam<strong>in</strong>ation by a Dangerous Substance (unless caused by theSupplier’s negligent acts or omissions) which needs to be removed or treated;any defect or flaw (<strong>in</strong>clud<strong>in</strong>g latent defect) <strong>in</strong> the condition of the Facility orSite (<strong>in</strong>clud<strong>in</strong>g underground assets such as the Purchaser’s pipel<strong>in</strong>es and tanksbelong<strong>in</strong>g to the water authority and sewerage undertaker) other than a defectresult<strong>in</strong>g from a breach of the Supplier’s obligations under this Contract whichis <strong>in</strong> existence at the date of this Contract; and(o) suspension pursuant to Clause 15.4.17.4 Consequences of Release Events(a)(b)The Supplier shall give notice, to the Purchaser, of a Release Event upon itbe<strong>in</strong>g foreseen by, or becom<strong>in</strong>g known to, the Supplier.If and to the extent that the Supplier is prevented or h<strong>in</strong>dered from execut<strong>in</strong>gthe Services as a result of a Release Event, for the period that the ReleaseEvent cont<strong>in</strong>ues the Supplier shall be relieved of its obligations to provide theServices but shall endeavour to perform its obligations under the Contract asfar as reasonably practicable, PROVIDED that if and to the extent that theSupplier <strong>in</strong>curs additional Cost <strong>in</strong> so do<strong>in</strong>g, the Supplier shall be entitled to theamount of such Cost (the Supplier hav<strong>in</strong>g taken reasonable steps to mitigatethat Cost).<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!