12.07.2015 Views

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2013. STAFF, LABOUR AND SITE13.1 Engagement of Staff and LabourThe Supplier shall make its own arrangements for the engagement of all staff andlabour, local or otherwise. 513.2 Health and SafetyThe Supplier shall comply with all applicable safety regulations <strong>in</strong> its design, accessarrangements and operations on Site. Precautions shall be taken by the Supplier toensure the health and safety of its staff and labour. The Supplier shall ma<strong>in</strong>ta<strong>in</strong>reasonable records and make reports concern<strong>in</strong>g health, safety and welfare of persons,and damage to property.The Supplier shall appo<strong>in</strong>t a member of its staff to be responsible for ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g thesafety, and protection aga<strong>in</strong>st accidents, of personnel on the Site. This person shall bequalified for his work and shall have the authority to issue <strong>in</strong>structions and takeprotective measures to prevent accidents. The Supplier shall send to the Purchaserdetails of any accident as soon as possible after its occurrence.13.3 Supplier's PersonnelThe Supplier shall employ (or cause to be employed) <strong>only</strong> persons who areappropriately qualified, skilled and experienced <strong>in</strong> their respective trades oroccupations. The Supplier shall at all times take all reasonable precautions to preventany unlawful, riotous or disorderly conduct by or amongst its staff and labour, and topreserve peace and protection of persons and property <strong>in</strong> the neighbourhood of theServices aga<strong>in</strong>st such conduct.14. VARIATIONS14.1 Right to VaryVariations may be <strong>in</strong>itiated by the Purchaser at any time after the Effective Date andbefore the Expiry Date, either by <strong>in</strong>struction or by a request for the Supplier to submita proposal. If the Purchaser requests the Supplier to submit a proposal andsubsequently elects not to proceed with the change, the Supplier shall be reimbursedby the Purchaser for the Cost <strong>in</strong>curred, <strong>in</strong>clud<strong>in</strong>g design services.The Purchaser shall not be entitled to request a Variation which would reduce thescope of the Facility and/or the Services.The Supplier shall not make any alteration and/or modification of the Services, unlessand until the Purchaser <strong>in</strong>structs or approves a Variation.5 This assumes situation where Supplier is not tak<strong>in</strong>g on staff from Purchaser. If this is not the case,need to consider labor laws to determ<strong>in</strong>e whether staff can be transferred to Supplier, on what termsetc.<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!