43SCHEDULE 4FEES AND CONSEQUENCES OF TERMINATIONPART 1ChargeBase Monthly Charge: [ ] plus [Service Tax]Variable Charge: [ ] per m 3 of treated water supplied by Supplierfrom the Facility(a)On or after the Completion Date, the Supplier shall issue an <strong>in</strong>voice for thefirst payment of the Base Monthly Charge for the month <strong>in</strong> which theCompletion Date has fallen and for the month follow<strong>in</strong>g the month <strong>in</strong> whichthe Completion Date has fallen. In respect of all subsequent monthly <strong>in</strong>voicesthe Supplier shall issue an <strong>in</strong>voice on or after the first day of each month for:(i)(ii)the Base Monthly Charge <strong>in</strong> respect of the month follow<strong>in</strong>g the month<strong>in</strong> which the <strong>in</strong>voice is issued; andthe Variable Charge for the month preced<strong>in</strong>g the month <strong>in</strong> which the<strong>in</strong>voice is issued.(b)The Base Monthly Charge shall be adjusted <strong>in</strong> accordance with the follow<strong>in</strong>gformula applied annually on the anniversary of the Base Date:[Adjustment formula <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>dexation, <strong>in</strong>creases <strong>in</strong> volume, exchangerisk, actual operation cost]The Purchaser shall pay the Base Monthly Charge throughout the Operat<strong>in</strong>gPeriod irrespective whether the Facility is Available or not.(c)The Supplier shall vary the Variable Charge, accord<strong>in</strong>gly, if the Raw <strong>Water</strong>falls outside the band that is plus or m<strong>in</strong>us [ ] % of the design level as detailed<strong>in</strong> the Technical Specification.[Adjustment formula <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>dexation, <strong>in</strong>creases <strong>in</strong> volume, exchangerisk, actual operation cost](d)In the case of <strong>in</strong>terruptions to the Facility caused by a Purchaser Risk,reasonable loss of profit payable <strong>in</strong> accordance with clause 17.4(e) shall becalculated per day of <strong>in</strong>terruption as:Reasonable loss of profit per day = ([ ]m³ - actual m³ taken) x Variable Chargeper day<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!