29(c)(d)(e)If and to the extent that the Supplier suffers a delay dur<strong>in</strong>g the InstallationPeriod as a result of the Release Event then it shall be entitle to a fair andreasonable extension for the Time for Completion <strong>in</strong> accordance with Sub-Clause 7.3.If a Release Event results <strong>in</strong> a loss or damage to the Facility, then Suppliershall rectify such loss or damage to the extent required by the Purchaser,PROVIDED that any Cost of rectification (less any <strong>in</strong>surance proceedsreceived by the Supplier for the loss or damage) is borne by the Purchaser (theSupplier hav<strong>in</strong>g taken reasonable steps to mitigate the Cost).Release Events specified <strong>in</strong>:(i)(ii)Sub-Clauses 17.3(g), (j), (l) and (o); andSub-Clauses 17.3(a), (b), (c), (d), (e), (f), (h), (i), (k), (m) and (n) to theextent that they are due, directly or <strong>in</strong>directly, to the action or <strong>in</strong>actionof the Purchaserare “Purchaser Risks”. If the Supplier suffers delay or the Services are<strong>in</strong>terrupted as a result of a Purchaser Risk, and this results <strong>in</strong> a loss of profit bythe Supplier, then the Supplier shall be entitled to be compensated forreasonable loss of profit at the rates per day set out <strong>in</strong> Schedule 4 Part 1 <strong>in</strong>addition to the Base Monthly Charge.For all other Release Events, the Supplier shall not be entitle to a loss of profitelement dur<strong>in</strong>g the period of <strong>in</strong>terruption <strong>in</strong> addition to the Base MonthlyCharge. [Note: this is drafted on the assumption that Base Monthly Chargewill cover all fixed costs plus a profit element](f)(g)For the purposes of Clause 16 (term<strong>in</strong>ation), any Release Events which are notPurchaser Risks shall be treated <strong>in</strong> the same way as term<strong>in</strong>ation for extendedForce Majeure.The Supplier shall be entitled to payment of the Base Monthly Charge dur<strong>in</strong>gthe period of <strong>in</strong>terruption irrespective of whether the Release Event is aPurchaser Risk or not.17.5 Patent Rights[Note: Are Purchaser’s Patents be<strong>in</strong>g used? Is it likely the Purchaser will <strong>in</strong>fr<strong>in</strong>geany of Supplier’s patents? If so, a reciprocal <strong>in</strong>demnity is required]The Supplier shall <strong>in</strong>demnify the Purchaser aga<strong>in</strong>st all claims of <strong>in</strong>fr<strong>in</strong>gement of anypatent, registered design, copyright, trade mark or trade name, or other <strong>in</strong>tellectualproperty right, if:(a)the claim or proceed<strong>in</strong>gs arise out of the design, <strong>in</strong>stallation or use of theFacility;<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!