12.07.2015 Views

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

Water Treatment Plant BOT (New build only) - PPP in Infrastructure ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

40SCHEDULE 1TECHNICAL SPECIFICATION[To be provided][Specification to <strong>in</strong>clude description of:1. The Facility2. Guaranteed Levels:3. Pollution Incident4. Performance Tests5. AvailabilityQuantity (<strong>in</strong>clud<strong>in</strong>g maximum flow)Quality6. Utilities (to be provided by Purchaser)7. Facility Documents8. Purchaser Permits[Note: If discharg<strong>in</strong>g waste, Technical Specification should also provide forcompliance with Discharge Consent.][Note: Are Purchaser’s Requirements relevant?]<strong>PPP</strong> <strong>in</strong> <strong>Infrastructure</strong> Resource Center for Contracts, Laws and Regulations (<strong>PPP</strong>IRC) Reviewed: Victoria R. Delmon, LEGPShttp://www.worldbank.org/ppp November 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!