12.07.2015 Views

Ammended NI 43-101 Technical Report on the Biely ... - EMED Mining

Ammended NI 43-101 Technical Report on the Biely ... - EMED Mining

Ammended NI 43-101 Technical Report on the Biely ... - EMED Mining

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>EMED</strong> <strong>Mining</strong> - <strong>Biely</strong> VrchNovember 201020.0 INTERPRETATION AND CONCLUSIONSThe current estimate of mineral resources of <strong>the</strong> <strong>Biely</strong> Vrch project are as detailed in Table 12.The key results from <strong>the</strong> various <strong>Biely</strong> Vrch studies were: The mineralisati<strong>on</strong> forms an epi<strong>the</strong>rmal type quartz-vein stockwork gold deposit; That part of <strong>the</strong> Mineral Resource within an $800 open-pit shell was estimated as: Indicated 15.7 Mt @ 0.86 g/t Au c<strong>on</strong>taining <str<strong>on</strong>g>43</str<strong>on</strong>g>4 Koz Au; Inferred 11.8 Mt @ 0.85 g/t Au c<strong>on</strong>taining 323 Koz Au; An optimised open-pit shell at a $800/oz gold price would yield 27.5 Mt of ore-gradematerial at an average grade of 0.86 g/t gold and c<strong>on</strong>taining 756,000 oz of gold(AMC, 2010); An Open-pit, heap-leach gold mining project with overall gold recoveries of 81%would yield about 615,000 oz of gold; and The gold recoveries were measured by mineralisati<strong>on</strong> type and <strong>the</strong> figures used in <strong>the</strong>optimisati<strong>on</strong> were for 10 to 12 mm crushed product.The resource estimates have been prepared in accordance with <strong>the</strong> JORC code. There are no materialdifferences between CIM and JORC definiti<strong>on</strong>s of mineral resources.The <strong>Biely</strong> Vrch Scoping Study (AMC, 2010) indicated a positive base-case ec<strong>on</strong>omic profile for <strong>the</strong>development of an open-pit, heap-leach project producing about 60,000 ounces of gold per year over aten-year mine life.The Scoping Study is preliminary in nature and includes inferred mineral resources that arec<strong>on</strong>sidered too speculative geologically to have <strong>the</strong> ec<strong>on</strong>omic c<strong>on</strong>siderati<strong>on</strong>s applied to <strong>the</strong>m thatwould enable <strong>the</strong>m to be categorized as mineral reserves. The ec<strong>on</strong>omic c<strong>on</strong>siderati<strong>on</strong>s in <strong>the</strong>following secti<strong>on</strong>s c<strong>on</strong>stitute a preliminary assessment <strong>on</strong>ly and <strong>the</strong>re is no certainty that <strong>the</strong>preliminary assessment will be realized.21.0 ECONOMIC CONSIDERATIONSCost Estimates and Ec<strong>on</strong>omic AssessmentBehre Dolbear has reviewed <strong>the</strong> cost estimates and cash flow forecast of <strong>the</strong> <strong>Biely</strong> Vrch ScopingStudy report dated July 2010, compiled by AMC C<strong>on</strong>sultants, in order to c<strong>on</strong>firm that <strong>the</strong>y adequatelyrepresent <strong>the</strong> expected costs and ec<strong>on</strong>omic feasibility of <strong>the</strong> operati<strong>on</strong>.The report is based <strong>on</strong> two different scenarios, namely Flat Pad scenario, and Valley Leach scenario.Capital and operating costs differ for each scenario, due to different levels of capital investment and<strong>the</strong> different levels of complexity of <strong>the</strong> mining operati<strong>on</strong>. Cost estimates were developed for eachscenario.Capital Cost estimates were derived by Kappes Cassidy and Associates Australia (KCAA) and AMC,using industry benchmarking and input from <strong>EMED</strong>, and are summarised in Table 17 below.<str<strong>on</strong>g>NI</str<strong>on</strong>g> <str<strong>on</strong>g>43</str<strong>on</strong>g>–<str<strong>on</strong>g>101</str<strong>on</strong>g> <str<strong>on</strong>g>Technical</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> 36 BEHRE DOLBEARLegal*5650400.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!