12.07.2015 Views

rotary press trailer system specification - The City of Titusville, Florida

rotary press trailer system specification - The City of Titusville, Florida

rotary press trailer system specification - The City of Titusville, Florida

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B. Equipment furnished under the section shall be fabricated, assembled, erected and delivered in full conformitywith the drawings, <strong>specification</strong>s, engineering data, instructions and recommendations <strong>of</strong> the equipment manufacturer,unless exceptions are noted and approved by the engineer prior to installation. Any request for exceptionsto any <strong>specification</strong> and/or stated requirements must be submitted and received a minimum <strong>of</strong> ten (10)working days prior to bid date.C. <strong>The</strong> Rotary Fan Press Trailer System shall be the product <strong>of</strong> a manufacturer regularly engaged in the manufacturingand supply <strong>of</strong> Rotary Fan Press Trailer Systems in the USA. All equipment shall be factory assembledand tested prior to shipment to ensure proper operation <strong>of</strong> all <strong>system</strong>s and be readied for field connections asshown on the project drawings. Any and all parts shall be suitable <strong>of</strong> the intended service conditions, in newcondition and assembled in accordance with the best engineering and shop practices.D. All <strong>of</strong> the equipment specified herein shall be <strong>of</strong>f-loaded, properly stored, and placed in proper operating conditionby the installing contractor in accordance with the engineering data, instructions and recommendation <strong>of</strong>the manufacturer and best construction practices.1.02 – General System DescriptionsConsideration will be given only for pre-approved equipment meeting minimum <strong>system</strong> requirements. <strong>The</strong>Rotary Fan Press Trailer System shall be the model #RFP36D-TR as manufactured by Prime Solution, Inc.<strong>The</strong> contractor will be responsible for any changes necessary to the designs and drawings for any alternateequipment supplied. <strong>The</strong> complete dewatering <strong>system</strong> shall consist <strong>of</strong> one (1) Prime Rotary Fan Press,Ancillary Equipment and Interconnecting Wiring/Plumbing that at a minimum contain:‣ One (1) 20’ Trailer.‣ One (1) Positive Displacement Sludge Feed Pump with VFD Direct Gear Drive Motor.‣ One (1) Emulsion Polymer Feed/Blend System.‣ One (1) PLC Process Controls, Manual and Semi-Auto Operation.‣ One (1) Retention Sludge/Polymer Piping with Adjustable Mixer and Injection Ring.‣ One (1) Rotary Fan Press with Stainless Steel, Hard Chrome Plated Slotted Filer Screens.‣ One (1) Stainless Steel Folding Sludge Cake Conveyor‣ One (1) Air Com<strong>press</strong>or with Receiver.‣ One (1) Central NEMA 4X Electrical Control Panel with Touch Screen Operator Interface.‣ One (1) Standard Workmanship Warranty.‣ Spare Parts Readily Available Within <strong>The</strong> United States <strong>of</strong> America.Consideration for <strong>City</strong> approval <strong>of</strong> another manufacturer not listed above, Vendor shall be required to perform anon-site full scale pilot test, not exceeding thirty (30) days after the bid opening date, demonstrating that theequipment proposed by such Vendor and/or manufacturer is capable <strong>of</strong> meeting the minimum performance requirementsestablished herein.1.03 – Quality AssuranceA. All equipment specified under this section shall be furnished by a single Rotary Fan Press manufacturer locatedin the USA who is fully experienced, reputable and qualified in the production <strong>of</strong> the major equipment items tobe furnished. <strong>The</strong> manufacturer shall be responsible for the sludge dewatering <strong>system</strong> as noted in this <strong>specification</strong>.B. Consideration will be given only to products <strong>of</strong> manufacturers who can demonstrate that their equipment fullycomplies with all requirements <strong>of</strong> the <strong>specification</strong>s, warranties and contract documents. <strong>The</strong> Owner and/or EngineeringFirm, at all times, are the sole judge <strong>of</strong> “Exact Equivalent”, “Approved Alternate” and “Or Equal”designations to the <strong>specification</strong>s.Rotary Press Trailer System Specification Page 2 <strong>of</strong> 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!