12.07.2015 Views

rotary press trailer system specification - The City of Titusville, Florida

rotary press trailer system specification - The City of Titusville, Florida

rotary press trailer system specification - The City of Titusville, Florida

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C. Each copy <strong>of</strong> the manual shall be assembled in one (1) or more loose leaf three (3) ring hard backed binders.Each binder shall be clearly labeled with identifying cover showing project, manufacturer’s name and modelnumber. All composition and printing shall be arranged so that punching does not obliterate any data and eachsection shall be clearly marked. All information on the CD shall be <strong>of</strong> a pdf format.1.10 – Manufacturer’s Supervisory Services and TestingA. <strong>The</strong> Manufacturer shall furnish the services only <strong>of</strong> a qualified factory representative for a minimum period <strong>of</strong>time at the job-site as listed below. Additional services, if requested, shall be available at the manufacturer’slisted portal to portal per diem rate in effect at time <strong>of</strong> delivery <strong>of</strong> service, plus all travel and living expenses.B. Installation:1. A minimum <strong>of</strong> one (1) trip and one (1) day at job-site; a qualified Prime Solution, Inc. representativeshall inspect all supplied equipment <strong>of</strong> the manufacturer for physical damage, correct placement for requiredservice, utility connections and general operation.C. Start-Up:1. <strong>The</strong> equipment manufacturer shall receive two (2) weeks written notice that all installation is completed,representative sludge is available and appropriate chemistry/polymer is on-site prior to arrivingfor start-up by the Owner and/or Contractor.D. Training:2. A minimum <strong>of</strong> three (3) days on-site shall be used to perform equipment and <strong>system</strong> start-up testing andcalibrations to be followed by training and performance testing within the same trip.3. Should the manufacturer’s representative arrive at the job-site and installation is not complete and/orthe appropriate chemistry/polymer is not on-site, the manufacturer shall be allowed to bill the Owner orContractor for the additional time and expense not covered under this <strong>specification</strong>.1. <strong>The</strong> manufacturer shall train the Owners personnel on equipment operation, maintenance and troubleshootingwith a minimum <strong>of</strong> four (4) hours <strong>of</strong> operation manual review and four (4) hours <strong>of</strong> hands onequipment and <strong>system</strong> operation.E. Performance Testing:1. Prior to the Performance/Acceptance Testing, the Owner’s selected chemical/polymer supplier shallperform testing <strong>of</strong> the sludge and supply the required chemistry/polymer for the manufacturer to meetthe performance requirements as listed in this <strong>specification</strong>.2. Testing shall consist <strong>of</strong> test samples taken once per hour and shall be grab samples.3. Samples shall be tested by an approved independent laboratory paid for by the Owner and <strong>of</strong> theOwner’s choosing. All results shall be given directly to the Owner and Manufacturer.4. In the case <strong>of</strong> non-acceptable performance due to the Manufacturer, Owner and/or Chemical/PolymerSupplier.A. Manufacturer – Should the Manufacturer’s equipment supplied per this <strong>specification</strong> be founddefective in meeting the functionality requirements, the Manufacturer shall have sixty (60) daysin which to prove functionality. At its sole expense, supplemental testing and equipment modificationsin order to perform any retest <strong>of</strong> the <strong>system</strong> to meet the requirements listed for the project.Rotary Press Trailer System Specification Page 5 <strong>of</strong> 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!