12.07.2015 Views

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PHASE A – ALTERNATIVES ANALYSIS REPORTMajor <strong>Drainage</strong>way Planning Update for Hidden Lake-Bates LakeJULY 29, 2008Mr. Ken MacKenzie<strong>Urban</strong> <strong>Drainage</strong> <strong>and</strong> <strong>Flood</strong> Control District2480 West 26 th Avenue, Suite 156-BDenver, CO 80211Subject:Dear Mr. MacKenzie:Major <strong>Drainage</strong>way Planning Update for Hidden Lake – Bates Lake<strong>Phase</strong> A - <strong>Alternatives</strong> <strong>Analysis</strong> <strong>Report</strong>UDFCD Agreement No. 08-01.06Matrix Design Group, Inc. is pleased to submit this report entitled Major <strong>Drainage</strong>way Planning Update forHidden Lake-Bates Lake, <strong>Phase</strong> A – <strong>Alternatives</strong> <strong>Analysis</strong> <strong>Report</strong>, dated July 2008.Many changes have occurred in the study area since the last Major <strong>Drainage</strong>way Planning Study wascompleted in 1975. L<strong>and</strong> use has changed <strong>and</strong> there has been extensive development within the watershed,which has changed the imperviousness of the area. Because of the changes in the watershed this <strong>Phase</strong> A<strong>Report</strong> will be used to determine which of the proposed alternatives will be selected to be furtherinvestigated in the <strong>Phase</strong> B <strong>Report</strong> with the selected drainage improvement alternatives.We would like to acknowledge the help <strong>and</strong> support in the preparation of this report that was furnished bythe City of Arvada, the City of Westminster, <strong>and</strong> Adams County.The enclosed text <strong>and</strong> exhibits present the alternatives analyses that were completed for the Hidden Lake-Bates Lake <strong>Drainage</strong>way. <strong>Alternatives</strong> were explored that will either: reduce flooding, improve stormwaterconveyance, or improve water quality.Thank you for the opportunity to complete this phase of the project.Regards,Matrix Design Group, Inc.________________________________________________________________Stu Williams, P.E.Principal-In-Charge________________________________________________________________Robert Krehbiel, P.E.Project Manager________________________________________________________________Tim Fairbank, P.E.Project Engineer________________________________________________________________Jennifer Newby, E.I.EngineerThis study will supersede the alternatives evaluation that was done for the “Major <strong>Drainage</strong>way Planning:Hidden Lake – Bates Lake” by Hydro-Triad, Ltd., dated November 1975.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!