12.07.2015 Views

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PHASE A – ALTERNATIVES ANALYSIS REPORTMajor <strong>Drainage</strong>way Planning Update for Hidden Lake-Bates LakeMeeting MinutesHidden Lake – Bates LakeMajor <strong>Drainage</strong>way Planning UpdateTuesday June 3, 2008, 2:30pm – 4:00 pm at UDFCDAttendees:Ken MacKenzie UDFCD 303-455-6277 kam@udfcd.orgShea Thomas UDFCD 303-455-6277 sthomas@udfcd.orgBesharah Najjar Adams County 303-453-8770 bnajjar@co.adams.co.usGeorgia Simpson City of Arvada 720-898-7646 gsimpson@arvada.orgJohn Burke City of Westminster 303-430-2400 x2126 jburke@ci.westminster.co.usStu Williams Matrix Design Group 303-572-0200 stu_williams@matrixdesigngroup.comRobert Krehbiel Matrix Design Group 303-572-0200 robertk@matrixdesigngroup.comTim Fairbank Matrix Design Group 303-572-0200 tim_fairbank@matrixdesigngroup.comJenn Newby Matrix Design Group 303-572-0200 jennifer_newby@matrixdesigngroup.comPurpose:a. Review Baseline Hydrology <strong>Report</strong> commentsb. Review Draft <strong>Flood</strong>plain <strong>and</strong> Hydraulic Modelingc. Discuss <strong>Phase</strong> A <strong>Alternatives</strong>Near Term Schedule Upcoming Deadlinesa. June 6 – Public Meeting Invite List due from Communities to UDFCDb. June 13 – Mail Out Public Meeting Noticec. June 19 – Benefit-Cost Calculationsd. June 19 – Steering Committee Meetinge. June 25 – Draft <strong>Phase</strong> A <strong>Report</strong>f. June 24-26 – Public Meeting (to be determined based upon site availability)g. July 9 - Comments Dueh. July 23 – Final <strong>Phase</strong> A <strong>Report</strong>1. Baseline Hydrology <strong>Report</strong> Comments from UDFCD to be addresseda. Update the tributary area in Table A-3 for Design Points 116, 117, 118, 207, 208, <strong>and</strong> 209.b. Discuss how the split flows were determined.c. Correct area <strong>and</strong> % impervious values in Table A-1 for sub-basins B2 <strong>and</strong> B3.d. Correct % impervious value for sub-basin B2 on Figure 2-5.e. The flow at Design Point 114 looks high. Verify flow is being routed <strong>and</strong> reported correctly.f. Why is there a double peak in the Hydrograph for James Baker Reservoir? The peak flow in thehydrograph is larger than the peak flow reported in Table A-3.g. UDFCD has noted problems with the current version of CUHP-2005. Once the model is fixed, UDFCDwill have Matrix re-run the hydrology with the updated model version.2. Project Websitea. The project website has been set up <strong>and</strong> is located at: http://projects.udfcd.org/hidden_lake/index.htm3. Presentation of Initial <strong>Flood</strong>plain <strong>Analysis</strong>a. Presentation of floodplain mapping <strong>and</strong> profilesi. Confirm starting elevation of Clear Creek floodplain for all profiles. Use 10-yr WSE on ClearCreek as the downstream control for the 100-yr analysis of Hidden Lake.b. Deficiencies1. Hidden Lakei.Sheridan crossing – undersized for 100-year flowii.66 th Avenue – twin 42” equivalent need to be twin 48” equivalent2. Bates Lakei.RR tracks inundatedc. Damage Assessment – inundated buildings noted on the floodplain map4. <strong>Phase</strong> A <strong>Alternatives</strong>Hidden Lake WatershedReach H-1: Headwaters to Sheridan Boulevard1. Do Nothing2. Regional Detentiona. Construction detention basin in park at the intersection of Wadsworth Blvd & 68 th Ave.(Arvada Center)b. Draft agreements to convert the existing detention basin in Faversham Park into a regionaldetention basin.c. Draft agreements to convert the existing detention basins on the Wal-Mart property into aregional detention basin.3. Improved Conveyancea. Construct additional conveyance between Wadsworth Blvd. <strong>and</strong> Sheridan Blvd.b. Upsize the box culvert under Sheridan Blvd. to increase capacity.c. Raise the Grace Church access road <strong>and</strong> install a box culvert under it.4. Water Qualitya. Provide water quality in the bottom of the detention basin proposed in Alternative 2a.b. Construct a water quality pond upstream of the Grace Church access road.Reach H-2: Hidden Lake1. Do Nothing2. Water Quality - Construct a fore-bay east of Sheridan Blvd, south of 69 th Ave.Reach H-3: Lowell Blvd. between Hidden Lake & Lake Sangraco1. Do Nothing2. Improved Conveyancea. Upsize the elliptical pipes under 66 th Ave to a box culvert.b. Replace 96” CMP if needed due to corrosion <strong>and</strong> abrasion3. Water Quality - Remove the low flow concrete channel <strong>and</strong> replace with a buried soil riprap lined lowflow channel <strong>and</strong> water quality check structures.Reach H-4: Lake Sangraco to Clear Creek.1. Do Nothing2. Water Quality - Revise the 96-inch RCP outlet to have low flows discharge into a fore-bay north of62 nd Ave.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!