12.07.2015 Views

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

Phase A - Alternatives Analysis Report - Urban Drainage and Flood ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PHASE A – ALTERNATIVES ANALYSIS REPORTMajor <strong>Drainage</strong>way Planning Update for Hidden Lake-Bates Lakethe James Baker Reservoir were to overtop. James Baker Reservoir contains the 100-year storm eventfrom the basin.h. Are there any flooding issues near Federal Blvd? That area is not adjacent to either of the main stemflowpaths so no detailed hydraulic model was developed in that area. No flooding issues wereidentified in that area as part of this study. Pipes have been recently added to 64 th Ave.i. The suggestion was made to crush up the existing concrete low flow channel adjacent to Lowell Blvd<strong>and</strong> use the concrete as riprap for the channel bank lining if the water quality alternative of removingthe concrete low flow channel is proposed.j. The suggestion was made to install a wetl<strong>and</strong> pond as the forebay upstream of Hidden Lake east ofSheridan Blvd.k. The concern was raised that designing storm drains for a 2 or 5-year storm event is not conservativeenough. Current design criteria in Arvada is to design the pipe for the 3½ year storm <strong>and</strong> have theroads convey any additional flow.l. A concern was raised about a lack of maintenance of facilities after they are constructed. It wasdescribed that quite a few State restrictions have been put on local communities regardingmaintenance when they discharge to Waters of the US, such as Clear Creek. If facilities are designed<strong>and</strong> built per current criteria, they can be declared “maintenance eligible” by UDFCD. UDFCD willmaintain them on behalf of the local community.Meeting MinutesHidden Lake – Bates LakeMajor <strong>Drainage</strong>way Planning UpdateThursday July 15, 2008, 2:00pm – 4:00 pm at UDFCDAttendees:Ken MacKenzie UDFCD 303-455-6277 kam@udfcd.orgShea Thomas UDFCD 303-455-6277 sthomas@udfcd.orgGeorgia Simpson City of Arvada 720-898-7646 gsimpson@arvada.orgJohn Burke City of Westminster 303-658-2126 jburke@ci.westminster.co.usRobert Krehbiel Matrix Design Group 303-572-0200 robertk@matrixdesigngroup.comTim Fairbank Matrix Design Group 303-572-0200 tim_fairbank@matrixdesigngroup.comJenn Newby Matrix Design Group 303-572-0200 jennifer_newby@matrixdesigngroup.comGeorge Kast Hidden Lake OwnerAlan Gillan Aloha Beach Ownerj. George Kast was concerned about any changes, due to this study, that would affect his ability toconstruct a development along the north shore of Hidden Lake. No new restrictions on developmentwill be imposed due to this study.14. Draft <strong>Phase</strong> A Commentsa. A list of the formal comments <strong>and</strong> resolutions are included on the attached spreadsheet.b. Additional comments to those formally submitted.i. The formal name of James Baker Reservoir is “Jim Baker Reservoir”. Change the name onall of the exhibits <strong>and</strong> in the <strong>Phase</strong> A report.ii. Make the <strong>Phase</strong> A report a double sided document.iii. Include the jurisdictional boundaries on the Study Area Map.iv. Submit all of the copies of the Final <strong>Phase</strong> A report to Ken on July 29 th .15. Resolutionsa. Overalli. Model the hydraulics of the recommended plan <strong>and</strong> show the proposed floodplain on Figures7-1 through 7-6.b. Reach H-1i. Keep the proposed box culvert under the Grace Church access road a double 3.5’ x 10’ boxculvert. This culvert has the 100-year capacity <strong>and</strong> is easier to maintain than the currentlyproposed double 2.5’ x 10’ box culvert.ii. Include property acquisition costs for the box culvert under the Grace Church access road.c. Reach H-2i. Change the proposed forebays in Reach H-2 to a water quality wetl<strong>and</strong>.ii. Remove the restaurant over Hidden Lake from the “Inundated buildings” hatching.d. Reach B-1i. Review options for water quality in the Bates Lake improvements. The existing low flowsbypass this lake. Parks <strong>and</strong> the community may be concerned with st<strong>and</strong>ing water for 40hours. It may not be possible to retrofit this Park with water quality.Purpose – Review Draft <strong>Phase</strong> A <strong>Report</strong> commentsu. Meet the owners of Hidden Lake <strong>and</strong> Aloha Beachv. Discussions about the operation of Hidden Lakew. Address <strong>Phase</strong> A CommentsNear Term Schedule Upcoming Deadlinesi. July 29 – Final <strong>Phase</strong> A <strong>Report</strong>j. August 26 – Selection of Preferred Alternative13. Update on Lake Operationh. Hidden Lake has a total volume of 2,200 Acft.i. Lake L’Nor <strong>and</strong> Lake Pompano are the lakes north of Aloha Beach Lake.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!