- Page 1 and 2: RAJASTHAN STATE ROAD DEVELOPMENT &C
- Page 3 and 4: to its Proposal. All such costs and
- Page 5 and 6: Sole Firm As defined in Clause 2.1.
- Page 7: Form 8: Experience of ApplicantForm
- Page 12 and 13: 2. INSTRUCTIONS TO APPLICANTSA. GEN
- Page 14 and 15: Traffic- cum-Safety ExpertSurveyorF
- Page 16 and 17: (iii) such Applicant receives or ha
- Page 18 and 19: 2.8.2 The Authority reserves the ri
- Page 20 and 21: 2.11.2 All such amendments will be
- Page 22 and 23: should be able to complete the Cons
- Page 24 and 25: 2.16.5 The completed Proposal must
- Page 26 and 27: (d) it is signed, sealed, hard boun
- Page 28 and 29: 2.26 IndemnityThe Consultant shall,
- Page 30 and 31: 3(f)Quantity Surveyor/Documentation
- Page 32 and 33: 4. FRAUD AND CORRUPT PRACTICES4.1 T
- Page 34 and 35: 5. PRE-PROPOSAL CONFERENCEDELETED34
- Page 36 and 37: SCHEDULE36
- Page 38 and 39: Consultancy for aDetailed Project R
- Page 40 and 41: xvi. economic and financial analyse
- Page 42 and 43: The Consultants shall carry out app
- Page 44 and 45: ii. Establishing Bench marks at sit
- Page 46 and 47: ii. The results of the survey shall
- Page 48 and 49: purposes, the Consultants shall rev
- Page 50 and 51: 1. The embankments design should pr
- Page 52 and 53: environmental management plan shall
- Page 54 and 55: Scenario - II Base Costs plus 15% a
- Page 56 and 57: 10.2 Inception Report (IR)1. The re
- Page 58 and 59: presented in tabular as well as in
- Page 60 and 61:
4. All equipment, software and book
- Page 62 and 63:
SUPPLEMENT IADDITIONAL POINTS TO BE
- Page 64 and 65:
viii. Safe bearing capacityix. Engi
- Page 66 and 67:
(h) Environmental ExpertEducational
- Page 68 and 69:
Proforma - 2INVENTORY AND CONDITION
- Page 70 and 71:
Proforma - 4ROAD CONDITION SURVEYDa
- Page 72 and 73:
SCHEDULE - 2(See Clause 2.1.3)AGREE
- Page 74 and 75:
4. Consultant’s Personnel and Sub
- Page 76 and 77:
(i) “Expatriate Personnel” mean
- Page 78 and 79:
under this Agreement, including wit
- Page 80 and 81:
(a) A Party affected by an event of
- Page 82 and 83:
espect to documents prepared by the
- Page 84 and 85:
found by the Authority to have dire
- Page 86 and 87:
This limitation of liability shall
- Page 88 and 89:
instructions of the Authority. Whil
- Page 90 and 91:
Agreement, the Authority shall make
- Page 92 and 93:
In addition to the liquidated damag
- Page 94 and 95:
Annex -1Terms of Reference(Refer Cl
- Page 96 and 97:
Annex-3Deleted96
- Page 98 and 99:
Annex-5Cost of Services(Refer Claus
- Page 100 and 101:
3. Detailed Project Report shall be
- Page 102:
4. We, ……………….. (indica
- Page 105 and 106:
5. Another approach to avoiding a c
- Page 107 and 108:
APPENDIX-I(See Clause 2.1.3)TECHNIC
- Page 109 and 110:
arising out of any documents or inf
- Page 111 and 112:
(i) Name of Firm:(ii) Legal Status
- Page 113 and 114:
APPENDIX-IForm-3Statement of Legal
- Page 115 and 116:
The mode of execution of the Power
- Page 118:
APPENDIX-IForm-6Particulars of Key
- Page 121 and 122:
APPENDIX-IForm-8Experience of the A
- Page 124 and 125:
APPENDIX-IForm-10Eligible Assignmen
- Page 126:
APPENDIX-IForm -12Curriculum Vitae
- Page 129 and 130:
Item of Work/ActivityTo be carried
- Page 131 and 132:
APPENDIX-IIFINANCIAL PROPOSALForm -