12.07.2015 Views

mogalakwena mine waste managment strategy - SRK Consulting

mogalakwena mine waste managment strategy - SRK Consulting

mogalakwena mine waste managment strategy - SRK Consulting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mogalakwena <strong>waste</strong> <strong>strategy</strong> February 2011__________________________________________________________________________________Table 7. The Anglo Platinum Permitting Requirements Action Plan 2011ANGLO PERMITTING REQUIREMENTS ACTION PLAN 2011Confirm <strong>waste</strong> storage capacities per <strong>waste</strong> type/categoryActivities Who? When?Deter<strong>mine</strong> whether the Waste Act applies by doing the assessmentas per above.Apply for <strong>waste</strong> authorization in terms of the Waste Act, if found tobe above thresholdsECsECsCompletedMarch 2011CompletedMarch 2011ECs December 20114.1 REVISED ACTION PLAN FOR LICENSE AUTHORISATION.In following the above procedure to assess <strong>waste</strong> areas, the situation on Mogalakwena Mineand Concentrators has progressed substantially. A revised action plan for the authorisation of<strong>waste</strong> sites, has been developed Table 8.Table 8. Mogalakwena Mine Revised Action Plan, May 2011.MOGALAKWENA : REVISED ACTION PLAN MAY 2011Activities Who? When?The existing landfill was licensed by the Department of Water Affairsand Forestry. It is nearing the designed maximum capacity. A landfillclosure plan is on hand, but a formal closure assessment must becompleted and submitted to DWA, when the Mine takes a decision toclose the area.ECWhen necessary.On closure, the landfill must be rehabilitated.A new landfill site has been identified. The site has been registeredwith LEDET and a Basic Assessment has been conducted. The EIAprocedure must be completed.• The Basic Assessment must still be submitted to LEDET.• Public Consultation Process.• Completion of a full EIA.• An authorisation through a Record of Decision from LEDETmust be obtained.• The landfill must be developed and commissioned.Five non hazardous salvage and <strong>waste</strong> transfer areas have beenidentified between the North and South Concentrators, that exceedthe threshold limit and which require an EIA.• A consultant must be appointed to conduct a joint EIA for the 5sites.• Completion of the EIA process.• An authorisation through a Record of Decision from LEDETmust be obtained.Mine<strong>SRK</strong><strong>SRK</strong><strong>SRK</strong>LEDETMineConcentrators.Consultant.LEDETJune 2011July 2011Dec 201120122012June 20112012201218

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!