13.07.2015 Views

1. Introduction - SRK Consulting

1. Introduction - SRK Consulting

1. Introduction - SRK Consulting

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SRK</strong> House265 Oxford RoadIllovo 2196P O Box 55291Northlands 2116South AfricaT: +27 (0) 11 441 1111F: +27 (0) 11 880 8086E: johannesburg@srk.co.zawww.srk.co.za10 December 2012452452To:Councillor J VoslooWard 18 of the Rustenburg Local MunicipalitySent via: emailDear Councillor VoslooENVIRONMENTAL AUTHORISATION FORTHE CONSTRUCTION AND OPERATION OF VENTILATION SHAFTS ATAQUARIUS PLATINUM SOUTH AFRICA’S (AQP(SA)) KROONDAL OPERATION ANDANGLO AMERICAN PLATINUM’S RUSTENBURG PLATINUM MINE-RUSTENBURG SECTION(RPM-RS): KWEZI AND K6 SHAFT OPERATIONS, NEAR RUSTENBURG, NORTH WESTPROVINCERPM-RS DMR REF: NW 30/5/1/2/2/81 MRRPM-RS DMR REF: NW30/5/1/2/2/84 MR<strong>1.</strong> <strong>Introduction</strong>AQP(SA) and RPM-RS proposes to undertake an addendum to the approved Kwezi Shaft and K6 Shaft EMPsrespectively to include the construction and operation of additional ventilation shafts. The proposed ventilation shafts willbe situated on RPM-RS lease and mining licence areas on the Remaining Portion of Portion 1, Portion 3 and Portion 117of the farm Town and Townlands of Rustenburg 272 JQ and on the Remaining Portion of Portion 9 of the farm Waterval303 JQ.The ventilation shafts are required to be developed at the Kwezi Shaft, K6 Shaft and in close proximity to the KroondalOperations, to service the existing underground mine workings, in order to comply with the Mine Health and Safety Act(Act No. 29 of 1996). The construction of the proposed ventilation shafts is critical for the continuation of the undergroundmining operations at the Kwezi, K6 and Kroondal Operations.Before the proposed project may be implemented, environmental authorisation is required from the Department ofMineral Resources (DMR) in terms of the Mineral and Petroleum Resources Development Act (Act No. 28 of 2002)(MPRDA).<strong>SRK</strong> <strong>Consulting</strong> has been appointed by AQP(SA) as the independent environmental assessment practitioner toundertake the compilation and submission of the Ventilation Shaft EMP Addenda to the DMR and facilitate theenvironmental authorisation process.Partners AH Bracken, MJ Braune, JM Brown, CD Dalgliesh, JR Dixon, DM Duthe, BM Engelsman, R Gardiner,DJD Gibson, T Hart, GC Howell, WC Joughin, DA Kilian, PR Labrum, DJ Mahlangu, RRW McNeill,HAC Meintjes, JA Middleton, MJ Morris, WA Naismith, GP Nel, VS Reddy, PN Rosewarne, PE Schmidt,PJ Shepherd, VM Simposya, AA Smithen, KM Uderstadt, DJ Venter, ML Wertz, MD Wanless, A WoodDirectors AJ Barrett, JR Dixon, PR Labrum, DJ Mahlangu, VS Reddy, PE Schmidt, PJ ShepherdAssociate Partners M Hinsch, JA Lake, SA McDonald, M Ristic, MJ Sim, JJ Slabbert, HFJ Theart, D VisserConsultants AC Burger, BSC(Hons); IS Cameron-Clarke, PrSciNat, MSc; JAC Cowan, PrSciNat, BSc(Hons);JH de Beer, PrSci Nat, MSc; GA Jones, PrEng, PhD; TR Stacey, PrEng, DSc; OKH Steffen, PrEng, PhD;PJ Terbrugge, PrSciNat, MSc; DW Warwick, PrSciNat, BSc(Hons)<strong>SRK</strong> <strong>Consulting</strong> (South Africa) (Pty) Ltd Reg No 1995.012890.07African Offices:Cape Town + 27 (0) 21 659 3060Durban + 27 (0) 31 279 1200East London + 27 (0) 43 748 6292Johannesburg + 27 (0) 11 441 1111Kimberley + 27 (0) 53 861 5798Pietermaritzburg + 27 (0) 33 345 6311Port Elizabeth + 27 (0) 41 509 4800Pretoria + 27 (0) 12 361 9821Rustenburg + 27 (0) 14 594 1280Accra + 23 (3) 24 485 0928Harare + 263 (4) 49 6182Lubumbashi + 243 (0) 81 999 9775Group Offices:AfricaAsiaAustraliaEuropeNorth AmericaSouth America


<strong>SRK</strong> <strong>Consulting</strong> Page 22. Public Meeting, EIA/EMP review and commentInterested and Affected parties (I&APs) are invited to attend a public meeting where the Kwezi and K6 EMPAddendum Report will be available for discussion and public review.The public meeting will take place as follows:Date: 17 January 2013Time: 10 am to 2 pmVenue: Rustenburg Platinum Mines – Rustenburg Section – Sports and Recreation ClubThe report will also be made available at the following public places for a review period of 30 days from 14January 2013 to 12 February 2013, for comments by stakeholders:Public Place Contact Person Contact NumberAquarius Platinum Kroondal Mine Ms Michelle Crawford 014 536 4000Rustenburg Public Library Mr Pieter Louw 014 590 3295I&APs are welcome to submit comments to the Public Consultation Office as indicated below.To register as an I&AP or to obtain more information or directions to the public meeting venue, pleasecontact the Public Consultation Office:Selma Nel<strong>SRK</strong> <strong>Consulting</strong>PO Box 55291, Northlands, 2116Tel: 011 441 1127/1111Fax: 086 575 1737Email: snel@srk.co.zaWe look forward to your participation.Yours faithfully,<strong>SRK</strong> <strong>Consulting</strong> (South Africa) (Pty) LtdSelma NelEnvironmental Scientist – Project ManagerAuthor/Reviewer 10122012_AQPSA_Stakeholder Letter_Re additional Ventilation Shafts_Blank.docx 22-Jan-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!