12.07.2015 Views

kn series gas boiler installation & operating ... - Agencespl.com

kn series gas boiler installation & operating ... - Agencespl.com

kn series gas boiler installation & operating ... - Agencespl.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 12KN INSTALLATION AND OPERATION INSTRUCTIONSCOMMON VENT SYSTEMSIf an existing <strong>boiler</strong> is removed from a <strong>com</strong>mon ventingsystem, the <strong>com</strong>mon venting system may then be toolarge for the proper venting of the remaining appliancesconnected to it. At the time of removal of an existing<strong>boiler</strong>, the following steps shall be followed with eachappliance remaining connected to the <strong>com</strong>mon ventingsystem placed in operation, while the other appliancesremaining connected to the <strong>com</strong>mon venting system arenot in operation.Au moment du retrait d'une chaudière existante, lesmesures suivantes doivent être prises pour chaqueappareil toujours raccordé au système d'évacuation<strong>com</strong>mun et qui fonctionne alors que d'autres appareilstoujours raccordés au système d'évacuation ne fonctionnentpas: système d'évacuationa) Seal any unused openings in the <strong>com</strong>mon ventingsystem.Sceller toutes les ouvertures non utilisées du systèmed'évacuation.b) Visually inspect the venting system for proper sizeand horizontal pitch and determine there is noblockage or restriction, leakage, corrosion and otherdeficiencies which could cause an unsafe condition.Inspecter de façon visuelle le système d'évacu-ationpour déterminer la grosser et l'inclinaisonhorizontale qui conviennent et s'assurer que lesystème est exempt d'obstruction, d'étranglementde fruite, de corrosion et autres défaillances quipourraient présenter des risques.c) Insofar as is practical, close all building doors andwindows and all doors between the space in whichthe appliances remaining connected to the <strong>com</strong>monventing system are located and other spaces of thebuilding. Turn on clothes dryers and any appliancenot connected to the <strong>com</strong>mon venting system. Turnon any exhaust fans, such as range hoods andbathroom exhaust, so they will operate at maximumspeed. Do not operate a summer exhaust fan for a<strong>boiler</strong> <strong>installation</strong>. Close fireplace dampers.l'espace où les appareils toujours raccordés dusystème d'évacuation sont installés et les autresespaces du bâtiment. Mettre en marche lessécheuses, tous les appareils non raccordés ausystème d'évacuation <strong>com</strong>mun et tous lesventilateurs d'extraction <strong>com</strong>me les hottes decuisinère et les ventilateurs des salles de bain.S'assurer que ces ventilateurs fonctionnent à lavitesse maximale. Ne pas faire fonctionner lesventilateurs d'été. Fermer les registres descheminées.d) Place in operation the appliance being inspected.Follow the lighting instructions. Adjust thermostat soappliance will operate continuously.Mettre l'appareil inspecté en marche. Suivre lesinstructions d'allumage. Régler le thermostat defaçon que l'appareil fonctionne de façon continue.e) Test for spillage at the draft hood relief opening after5 minutes of main burner operation. Use the flameof a match or candle, or smoke from a cigarette,cigar or pipe.Faire fonctionner le brûleur principal pendant 5 minensuite, déterminer si le coupe-tirage déborde àl'ouverture de décharge. Utiliser la flamme d'uneallunette ou d'une chandelle ou la fumée d'unecigarette, d'un cigare ou d'une pipe.f) After it has been determined that each applianceremaining connected to the <strong>com</strong>mon venting systemproperly vents when tested as outlined above, returndoors, windows, exhaust fans, fireplace dampersand any other <strong>gas</strong>-burning appliance to theirprevious condition of use.Une fois qu'il a été d éterminé, selon la métodeindiquée ci-dessus, que chaque appareil raccordéau système d'évacuation est mis à l'air libre de façoradéquate. Remettre les portes et les fenêtres, lesventilateurs, les registres de cheminées et lesappareils au gaz à leur position originale.Dans la mesure du possible, fermer toutes les porteset les fenêtres du bâtiment et toutes les portes entre

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!