Page 14KN INSTALLATION AND OPERATION INSTRUCTIONSBoiler Piping ConnectionsThe supply and return connections should be sized tosuit the system, see Table 8.Table 8 - Supply & Return Pipe SizingModel Supply ReturnSize Size Size600 2" NPT 2" NPT1000 3" NPT 3" NPT2000 3" NPT 3" NPTPump RequirementsThis <strong>boiler</strong> requires a continuous minimum water flowfor proper operation. The system pump must be sizedto over<strong>com</strong>e the head loss of the <strong>boiler</strong> and the heatingsystem in order to achieve the required temperature rise.If the system contains hydronic antifreeze this must beconsidered when sizing the pump. The temperature riseacross the <strong>boiler</strong> must never exceed 100°F, 55.6°C.Low Water CutoffEach KN <strong>boiler</strong> <strong>com</strong>es equipped with a factory installedlow water cutoff.Expansion Tank & Air SeparatorAn expansion tank or other means to control thermalexpansion must be installed in the heating system. Anexpansion tank must be installed close to the <strong>boiler</strong> onthe suction side of the pump. An air scoop andautomatic air vent must also be installed to eliminate airtrapped in the system.Primary/Secondary PipingFigure 9 shows a typical primary/secondary pipingsystem. A dedicated pump is used to maintain aconstant water flow through the <strong>boiler</strong>. Systems usingmultiple <strong>boiler</strong>s can be installed using a primary/secondary manifold system, Figure 10.Reverse Return PipingSystems using multiple <strong>boiler</strong>s can also be installedusing a reverse return system, Figure 11.Piping For Use With Cooling UnitsThe <strong>boiler</strong>, when used in connection with a refrigerationsystem, must be installed so the chilled medium is pipedin parallel with the <strong>boiler</strong>. Appropriate valves must beused to prevent the chilled water from entering the<strong>boiler</strong>.When a <strong>boiler</strong> is connected to a heating coil that maybe exposed to refrigerated air from an air handlingdevice, the piping system must be equipped with flowcontrolvalves or some other automatic means ofpreventing gravity circulation of the <strong>boiler</strong> water duringthe cooling cycle.NOTE: Minimum <strong>boiler</strong> flow rate is 15 gpm.Maximum <strong>boiler</strong> flow rate is 150 gpm.Figure 9 - Typical Single Boiler Primary/Secondary PipingNOTE: Not all system valves maybe shown. Consult local codes foradditional system <strong>com</strong>ponentswhich may be necessary.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!