Education Capability Statement - Rider Levett Bucknall
Education Capability Statement - Rider Levett Bucknall
Education Capability Statement - Rider Levett Bucknall
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Education</strong> | <strong>Capability</strong> <strong>Statement</strong>Client Project/Commission ValueThamesValleyFive storey teaching block comprisinggeneral teaching, hair and beauty with adedicated IT study zone. The project alsoincluded extensive refurbishment and arefectory extension.£15mDowningCollegeCambridgeAngliaPolytechnicCollege ofNorth WestLondonGwentCollegeFrameworkThe project is for the provision of the NewHoward Theatre which comprises a twostorey mixed use theatre, conference anddining facility.New Learning Research Centrecombining the facilities of a library withcomputerized workstations for students.Energy efficient attaining excellentBREEAM rating.The re-development of the College ofNorth West London’s Wembley Centre isone of a number of developmentscurrently underway as part of a phasedprogramme of works by the College. Theworks at Wembley comprise therefurbishment of Arena House to facilitatedecanting from Crescent House and thendemolition and re-development of theCrescent House site.RLB have this year (2007) secured aBuilding Surveying Framework / DesignServices Framework Agreement, to beresponsible for the implementation ofsmall works projects, mainly comprisingplanned and preventative maintenance,alteration and refurbishment works to theexisting College estate. The scope ofservices are to include initial feasibilitystudies identified as part of plannedmaintenance programmes or to addressalterations required to the College’sestate; condition/structural surveys andthe design and management of projectworks in the value band generally up to£100k£5.4m£6m£30mTBAwww.rlb.com