12.07.2015 Views

Education Capability Statement - Rider Levett Bucknall

Education Capability Statement - Rider Levett Bucknall

Education Capability Statement - Rider Levett Bucknall

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Education</strong> | <strong>Capability</strong> <strong>Statement</strong>Client Project/Commission ValueMinistry ofDefenceAndover North Site DevelopmentA £41 million capital works contract, theproject also includes a seven yearcompliance (maintenance and operation)period, which is linked to a range ofperformance and service quality keyperformance indicators.Whilst acknowledging the client’s normalpractice of appointing a principalcontractor for the project, <strong>Rider</strong> <strong>Levett</strong><strong>Bucknall</strong> analysed and evolved the briefand proposed a ‘next stage’ response: - aunique, consultant led constructionalliance - as being the ideal solution to theproject’s complex needs.As prime contractor, <strong>Rider</strong> <strong>Levett</strong> <strong>Bucknall</strong>assembled and managed a ‘virtualorganisation’ known as <strong>Rider</strong> <strong>Levett</strong><strong>Bucknall</strong> Prime Solutions, to workcollaboratively with the client team todeliver the works by offering a completedesign and build operation and on-goingmaintenance service.£41mAccrington &RossendaleCollegeBury CollegeThis scheme comprised the construction of anew construction and technology building for aleading construction skill centre in the NorthWest of England. <strong>Rider</strong> <strong>Levett</strong> <strong>Bucknall</strong>undertook design management on thescheme, tendered the project and advised theclient on contractor selection. <strong>Rider</strong> <strong>Levett</strong><strong>Bucknall</strong> took the scheme through the buildperiod liaising closely with both the client andthe contractor to achieve a successfulconclusionMillennium Centre, Bury College.Redevelopment of Peel Campus – new 4storey teaching facility, social and cateringaccommodation.£3.5m£6mwww.rlb.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!