Chapter 6. Implementati<strong>on</strong> and Maintenance 6-3<br />
c) Airlines d) Manufacturers<br />
Implementati<strong>on</strong> resource average Implementati<strong>on</strong> resource average<br />
Implementati<strong>on</strong> time (m<strong>on</strong>ths) 13.9 Implementati<strong>on</strong> time (m<strong>on</strong>ths) 21.4<br />
Employees used 9.5 Employees used 33.5<br />
Employees hired for implementati<strong>on</strong> 2.9 Employees hired for implementati<strong>on</strong> 19.6<br />
C<strong>on</strong>tractor support costs US$51 542 C<strong>on</strong>tractor support costs US$42 500<br />
Equipment costs US$19 699 Equipment costs US$0<br />
Certificati<strong>on</strong>/registrati<strong>on</strong> costs US$12 976 Certificati<strong>on</strong>/registrati<strong>on</strong> costs US$120 000<br />
Note.— Averages are based <strong>on</strong> 42 airline resp<strong>on</strong>ses. Note.— Averages are based <strong>on</strong> 8 manufacturer<br />
resp<strong>on</strong>ses.<br />
e) Other<br />
Implementati<strong>on</strong> resource average<br />
Implementati<strong>on</strong> time (m<strong>on</strong>ths) 15.2<br />
Employees used 11.2<br />
Employees hired for implementati<strong>on</strong> 5.8<br />
C<strong>on</strong>tractor support costs US$89 591<br />
Equipment costs US$33 344<br />
Certificati<strong>on</strong>/registrati<strong>on</strong> costs US$9 778<br />
Note.— Averages are based <strong>on</strong> 19 other resp<strong>on</strong>ses.<br />
6.2.4 The results indicated that, <strong>on</strong> average, a minimum of five employees were required during <strong>EMS</strong><br />
implementati<strong>on</strong>. Both airports and manufacturers provided larger estimates of 26 and 34 employees, respectively. All<br />
five sectors estimated the need for at least two additi<strong>on</strong>al employees, with the manufacturer sector resp<strong>on</strong>dents<br />
estimating an average need for 20 additi<strong>on</strong>al staff. The estimates for the number of employees required within each<br />
sector varied by organizati<strong>on</strong> size.<br />
6.2.5 C<strong>on</strong>tract support costs ranged from USD 42 000 to USD 90 000 for four of the five sectors (airports,<br />
airlines, manufacturers and other). ANSP resp<strong>on</strong>dents indicated an average cost for c<strong>on</strong>tractor support of over<br />
USD 500 000. Estimates for the average cost of equipment ranged from USD 10 000 to USD 34 000 for three of the five<br />
sectors (ANSPs, airlines and others). Manufacturer sector resp<strong>on</strong>dents did not estimate their equipment costs, and the<br />
airport sector resp<strong>on</strong>dents estimated an average equipment cost of USD 209 114. <strong>EMS</strong> certificati<strong>on</strong> and registrati<strong>on</strong><br />
costs for three of the five sectors (airports, airlines and other) ranged from USD 9 700 to USD 13 000. ANSP and<br />
manufacturer sector resp<strong>on</strong>dents estimated average <strong>EMS</strong> certificati<strong>on</strong> and registrati<strong>on</strong> costs to be much higher at<br />
USD 100 000 and USD 120 000, respectively.