12.07.2015 Views

Phase 4 – Wire L.T. Solid State ( Static) Whole Current ... - WBSEDCL

Phase 4 – Wire L.T. Solid State ( Static) Whole Current ... - WBSEDCL

Phase 4 – Wire L.T. Solid State ( Static) Whole Current ... - WBSEDCL

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

meter is to be installed in the Meter Box and the Box in assembled condition shall haveprovision to fix it on wall. The 4 no. self threaded screws of min. size of 4 mm dia and 25 mmlong shall be provided with each Meter Box.Marking / Embossing :The following information shall be clearly & indelibly embossed (not printed) on the cover andbase of the Meter Box. The top & bottom corner of Meter Box Sl.No. shall be same for theparticular Meter Boxi) Property of <strong>WBSEDCL</strong>ii) Name / Brand name of Manufactureriii) Meter Box Sl.Nos. (Embossed on both the base & covers of Meter Box)iv) Sign of dangerDrawing :Detailed dimensional drawing showing clearly the dimensions & material for Meter Box and itsconstructional features have been furnished with the tender specification which is binding onthe part of the manufacturer.Submission of Sample :Bidder shall submit a sample Meter Box as per our specification (or, as available with Bidder,however in the event of order it will be as per Specification before first inspection) along withthe sample meter to the office of the Chief Engineer, (DTD), Abhikshan Bhavan, Sector-V,Salt Lake, Kolkata-91 before the last day of submission of bid.Submission of sample meter box as per size available with the bidder but conforming to ourspecification towards its quality is acceptable . Type testing including material identification (IRSpectrometry test) of one meter box manufactured as per specification is to be conducted atany NABL accredited laboratory/CIPET by the supplier at their own cost after placement oforder. For type testing the meter box will be selected from the first offered lot of meter withmeter box. If the type test results are not found satisfactory, the offered lot of meter along withmeter box will be rejected.Testing :a) Type Test : The Meter Box offered shall be type tested as per relevant I.S. standards andthe Technical Specification stated below :The bidder must furnish type test report including material verification of the offered /samplemeter box from any NABL/Govt. approved laboratory as available with them along withtechnical bid without which the offer will not be considered. Type test report should not bemore than 5 (five) years old.b) Acceptance Test :The acceptance test as indicated in the enclosed table (Annexure-V) shall be carried outat the time of inspection of the offered material.c) Routine Test :The routine tests as indicated in the enclosed table (Annexure-V) shall be carried out androutine test certificates / reports shall be submitted to the purchaser’s inspection office at thetime of inspection of the offered material enclosed table (Annexure-V) shall be carried out atthe time of inspection of the offered material.Guarantee :The Pilfer Proof Meter Box should be guaranteed against any manufacturing defects arisingout of faulty design or bad workmanship or component failure for a period of 5 ½ years fromthe date of supply.The meter box found defective within the above guarantee period shall be replaced by theSupplier free of cost within one month of the receipt of intimation of failure/defect. Defectivemeter box are to be replaced by new one with new sl. nos. as allotted by C.E (DTD).Replacement of defective Meter Box :34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!