12.07.2015 Views

Phase 4 – Wire L.T. Solid State ( Static) Whole Current ... - WBSEDCL

Phase 4 – Wire L.T. Solid State ( Static) Whole Current ... - WBSEDCL

Phase 4 – Wire L.T. Solid State ( Static) Whole Current ... - WBSEDCL

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(e) Colour of meter box Grey/Off White(f) Meter mounting Arrangement Suitable for mounting of any make ofmeter (broadly as per the Drawing)(g) Box Mounting Arrangement 4 Nos. Holes(h) Hinges 2Nos. Concealed hinges(i) Incoming & Out going Cable holes 2 Nos, holes having 40mm dia andbottom entry. High grade doublecompression MS Cable glands fixedon both sides by check nuts to beprovided.TESTING :ANNEXURE -VII1. Sample selected from first lot should be tested at Govt. approved independent test house forcompliance of performance parameters as given in GTP including material identification to becarried out by CIPET/IR Spectrometry.2. The test report should be submitted to <strong>WBSEDCL</strong> before completion of order.3. Inspection of each lot, sampling plans for test: 1 nos. selected randomly from lot for testing atworks.Sl.Test Requirement for moulded meter boxReference Standardsno.(a) Marking IS:14772(b) Dimensions & construction IS:14772(c) Heat Deflection Temperature (Min. 150°C) IS:13411(d) Spirit Burner Test (Self Extinguishing) IS:4249(e) Melting Point (Does Not Melt up to 400 deg. C.) IS:1336038

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!