12.07.2015 Views

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

City <strong>of</strong> Charlottetown Section 01 30 00May <strong>2012</strong>Measurement for Payment<strong>2012</strong> Storm Pipe Construction, Package B Page 2 <strong>of</strong> 2.2 No additional payment will be made for topsoil or sod <strong>of</strong> areas disturbed for the Contractor’sconvenience.1.9 Pavement Reinstatement.1 Pavement reinstatement will be measured in square meter with a fixed width <strong>of</strong> 1.2 meters plus the<strong>pipe</strong> diameter.1.10 Gravel Reinstatement.1 Gravel reinstatement will be measured in square meter with a fixed width <strong>of</strong> 1.2 meters plus the<strong>pipe</strong> diameter.1.11 Storm Sewer.1 Supply and installation <strong>of</strong> <strong>storm</strong> sewer including testing and including excavation and backfillingand granular bedding and surround will be measured horizontally from manhole face to manholeface in metres <strong>of</strong> each <strong>pipe</strong> size and depth class installed. Safety grates on <strong>pipe</strong>s entering thesystem will be considered incidental to the work.1.12 Construction <strong>of</strong> Concrete Sidewalks.1 Payment shall be made on a square meter basis for <strong>construction</strong> <strong>of</strong> sidewalk. The unit price shallinclude the supply <strong>of</strong> sand and preparation <strong>of</strong> the sub-grade, the <strong>construction</strong> <strong>of</strong> forms, steeldowels between adjacent blocks, steel mesh, the supply and placing <strong>of</strong> the concrete, expansionjoints, compaction, temporary backfill with excavated material, finishing and curing <strong>of</strong> the concreteand other incidentals, all as specified.End <strong>of</strong> Section

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!