12.07.2015 Views

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

City <strong>of</strong> Charlottetown Section 01 41 00May <strong>2012</strong>Testing Laboratory Services<strong>2012</strong> Storm Pipe Construction, Package B Page 1 <strong>of</strong> 1Part 1General1.1 Testing Requirements Specified Elsewhere.1 Requirements for inspection and testing to be carried out and paid for by the Contractor arespecified under various technical Sections <strong>of</strong> the Specification.1.2 Contractor’s Related Responsibilities.1 The Contractor will arrange and pay for services <strong>of</strong> an independent testing firm to carry out thetests noted in Section 1.3 below..2 Furnish labour and facilities to:.1 Provide access to work to be inspected and tested..2 Facilitate inspections and tests..3 Make good work disturbed by inspection and test..3 Notify Engineer in advance <strong>of</strong> testing operations..4 Provide Engineer with two (2) sets <strong>of</strong> fully documented test reports, submitted immediatelyfollowing the testing operations.1.3 Inspection and Testing Requirements.1 Sandstone sub-base materials:.1 Test material at source; include collection <strong>of</strong> sample materials by testing firm to verifycompliance with material specifications..2 Perform a follow up test <strong>of</strong> material when delivered to site..3 Monitor placement and verify compaction..2 Granular base and bedding materials:.1 Test material at source; include collection <strong>of</strong> sample materials by testing firm to verifycompliance with material specifications..2 Perform a follow up test <strong>of</strong> material when delivered to site..3 Monitor placement and verify compaction..3 Concrete testing:.1 Review <strong>of</strong> concrete mix design submitted by Contractor..2 Monitor placement <strong>of</strong> concrete including, but not limited to slump, air content, watercontent, and as required in CAN-A23.2..3 Include for representative from testing firm to be on-site full-time during placement <strong>of</strong>concrete panels and blocks..4 Testing <strong>of</strong> concrete for compliance with material specifications from samples taken bytesting firm..4 Other tests as required.End <strong>of</strong> Section

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!