12.07.2015 Views

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

City <strong>of</strong> Charlottetown Section 31 23 10May <strong>2012</strong>Excavation, Trenching, and Backfilling<strong>2012</strong> Storm Pipe Construction, Package B Page 2 <strong>of</strong> 5.1 Conduct, with Engineer, condition survey <strong>of</strong> existing buildings, trees and other plants,lawns, fencing, service poles, wires, rail tracks, pavement, survey bench marks andmonuments which may be affected by Work..2 Protect existing buildings and surface features from damage while Work is in progress. Inevent <strong>of</strong> damage, immediately make repair to approval <strong>of</strong> Engineer.PART 2Products2.1 Materials.1 Type 1 Fill: Crushed rock composed <strong>of</strong> hard, sound, durable uncoated, cubical fragments <strong>of</strong>consistent quality produced from non-sedimentary bedrock or non-sedimentary boulders, to complywith the P.E.I. Department <strong>of</strong> Transportation and Infrastructure Renewal Specification 401 –Aggregate, for Class “A” material..2 Type 2 Fill: Crushed rock composed <strong>of</strong> hard, sound, durable, uncoated, cubical fragments <strong>of</strong>consistent quality produced from non-sedimentary bedrock or non-sedimentary boulders, to complywith the P.E.I. Department <strong>of</strong> Transportation and Infrastructure Renewal s Specification 401 –Aggregate, for Class “B” material..3 Type 3 Fill: Imported, classified as Common Fill, or material from excavation or other sources,approved by Engineer for use intended, unfrozen, free from rocks larger than 75mm, cinders,ashes, sods, refuse or other deleterious materials..4 Type 4 Fill: Natural sand or crushed rock screening, free from clay, shale or organic matter, tocomply with P.E.I. Department <strong>of</strong> Transportation and Infrastructure Renewal Specification 402 –Bedding Sand..5 Type 5 Fill: To requirements <strong>of</strong> P.E.I. Department <strong>of</strong> Transportation and Infrastructure RenewalSpecification #206.02.02 – Select Borrow as follows: Borrow shall be non-plastic and composed <strong>of</strong>clean, uncoated particles free from lumps <strong>of</strong> clay or other deleterious material with a maximumparticle size <strong>of</strong> 100 mm, and a maximum <strong>of</strong> 30% <strong>of</strong> the material passing the 4.75 mm sieve shallpass the 75 µm sieve.PART 3Execution3.1 Site Preparation.1 Remove obstructions, ice and snow, from surfaces to be excavated within limits indicated..2 Where applicable, strip topsoil from within limits <strong>of</strong> excavation and stockpile as directed byEngineer, for respreading..3 Sawcut pavement or concrete neatly along limits <strong>of</strong> proposed excavation in order that surface maybreak evenly and cleanly.3.2 Stripping <strong>of</strong> Topsoil.1 Commence topsoil stripping <strong>of</strong> areas after area has been cleared <strong>of</strong> brush, weeds and grasses andremoved from site.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!