12.07.2015 Views

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

city of charlottetown tender 2012 storm pipe construction package b ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

City <strong>of</strong> Charlottetown Section 31 23 10May <strong>2012</strong>Excavation, Trenching, and Backfilling<strong>2012</strong> Storm Pipe Construction, Package B Page 5 <strong>of</strong> 5.5 Place backfill material in uniform layers not exceeding 150 mm <strong>of</strong> compacted thickness up togrades indicated. Compact each layer before placing succeeding layer..6 Backfilling around installations..1 Place bedding and surround material as specified elsewhere..2 Do not backfill around or over cast-in-place concrete within twenty-four (24) hours afterplacing <strong>of</strong> concrete..3 Place layers simultaneously on both sides <strong>of</strong> installed Work to equalize loading..4 Where temporary unbalanced earth pressures are liable to develop on walls or otherstructures:.1 Permit concrete to cure for minimum fourteen (14) days or until it has sufficientstrength to withstand earth and compaction pressure and approval obtained fromEngineer or:.2 If approved by Engineer, erect bracing or shoring to counteract unbalance, andleave in place until removal is approved by Engineer..7 Place unshrinkable fill in areas as indicated..8 Consolidate and level unshrinkable fill with internal vibrators.3.9 Restoration.1 Upon completion <strong>of</strong> Work, remove waste materials and debris, trim slopes, and correct defects asdirected by Engineer..2 Replace topsoil as indicated by Engineer..3 Reinstate lawns to elevation which existed before excavation..4 Reinstate pavements and sidewalks disturbed by excavation to thickness, structure and elevationwhich existed before excavation..5 Clean and reinstate areas affected by Work as directed by Engineer..6 Use temporary plating to support traffic loads over unshrinkable fill for initial twenty-four (24) hours.End <strong>of</strong> Section

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!