12.07.2015 Views

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The report may also provide information to an MDA determination of whether the levelof manufacturing risk supports Milestone approval.When actual <strong>MRL</strong>s are compared to target values based on the stage of the lifecycle, the report provides a basis for an analysis and assessment of the risksassociated with each manufacturing thread. Cost, schedule or performancemanufacturing risks that are not resolved must be defined and require manufacturingmaturity plans. These plans should include a description of the approach to resolve therisk, cost estimates, resources available, and schedule impacts. The manufacturingmaturation plan is normally delivered along with the assessment report. See section 5.4-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!