12.07.2015 Views

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table A-5. <strong>Manufacturing</strong> <strong>Readiness</strong> <strong>Level</strong>s for the Process Capability and Control ThreadAcquisitionPhasePre-MSA MSA TD EMD LRIP FRPTechnical Reviews – ASR SRR/SFR PDR CDRThreadSub-Thread– TechnologyMaturityE –-Process Capability & ControlE.1 – Modeling & Simulation(Product & Process)E.2 – <strong>Manufacturing</strong> Process MaturityPRR/SVRPCA –<strong>MRL</strong> 1 <strong>MRL</strong> 2 <strong>MRL</strong> 3 <strong>MRL</strong> 4 <strong>MRL</strong> 5 <strong>MRL</strong> 6 <strong>MRL</strong> 7 <strong>MRL</strong> 8 <strong>MRL</strong> 9 <strong>MRL</strong> 10Should beassessedat TRL 1Should beassessed atTRL 2– Initial modelsdeveloped, ifapplicable.– Identificationof materialand/orprocessapproaches.Should beassessed atTRL 3Identificationof proposedmanufacturingconcepts orproducibilityneeds basedon high-levelprocess flowchartmodels.Documenthigh-levelmanufacturingprocesses.Critical manufacturingprocessesidentifiedthroughexperimentation.Should beassessed at TRL4Productionmodeling/simulationapproachesfor process orproduct areidentified.Complete asurvey todetermine thecurrent state ofcritical processes.Should beassessed atTRL 5Initialmodel/simulation(product orprocess)developed atthe componentlevel and usedto determineconstraints.Maturity hasbeen assessedon similar processesinproduction. Processcapabilityrequirementshave beenidentified forpilot line, LRIPand FRP.Should beassessed atTRL 6Initialmodel/simulationdeveloped at thesubsystem orsystem level, andused to determinesystem constraints.<strong>Manufacturing</strong>processesdemonstrated inproduction relevantenvironment.Collection orestimation ofprocess capabilitydata from prototypebuild has begun.Process capabilityrequirementsrefined.Should beassessed atTRL 7Model/simulationused todetermine systemconstraintsand identifyimprovementopportunities.<strong>Manufacturing</strong>processesdemonstratedin a productionrepresentativeenvironment.Continuecollecting orestimatingprocesscapability data.Processcapabilityrequirementsrefined.Should beassessedat TRL 7Model/simulationverified bypilot linebuild.Resultsused toimproveprocess anddeterminethat LRIPrequirementscanbe met.<strong>Manufacturing</strong>processesverified forLRIP on apilot line.Processcapabilitydata frompilot linemeetstarget.Processcapabilityrequirementsrefined.Should beassessedat TRL 8Model/simulationverified byLRIP build,assists inmanagementofLRIP anddeterminesthat FRPrequirementscanbe met.Should beassessedat TRL 9Model/simulationverified byFRP build.Productionsimulationmodelsused as atool toassist inmanagementofFRP.<strong>Manufacturing</strong>processesare stable,adequatelycontrolled,capableand haveachievedprogramLRIPobjectives.Variabilityexperimentsconductedtoshow FRPimpact andpotentialforcontinuousimprovement.<strong>Manufacturing</strong>processesarestable,adequatelycontrolled,capable,and haveachievedprogramFRPobjectives.A-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!