12.07.2015 Views

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A-2. <strong>Manufacturing</strong> <strong>Readiness</strong> <strong>Level</strong>s for the Design Thread (continued)AcquisitionPhasePre-MSA MSA TD EMD LRIP FRPTechnical Reviews – ASR SRR/SFR PDR CDRThreadSub-Thread– TechnologyMaturityB – DesignB.2 – Design MaturityPRR/SVRPCA –<strong>MRL</strong> 1 <strong>MRL</strong> 2 <strong>MRL</strong> 3 <strong>MRL</strong> 4 <strong>MRL</strong> 5 <strong>MRL</strong> 6 <strong>MRL</strong> 7 <strong>MRL</strong> 8 <strong>MRL</strong> 9 <strong>MRL</strong> 10Should beassessedat TRL 1<strong>Manufacturing</strong>researchopportunitiesidentified.Should beassessed atTRL 2Applicationsdefined.Broadperformancegoals identifiedthat maydrive manufacturingoptions.Should beassessed atTRL 3Top levelperformancerequirementsdefined.Tradeoffs indesign optionsassessedbased onexperiments.Product lifecycle andtechnicalrequirementsevaluated.Should beassessed at TRL4SEP and T&EStrategyrecognize theneed for theestablishment/validation ofmanufacturingcapability andmanagement ofmanufacturing riskfor the product lifecycle. Draft KeyPerformanceParameters(KPPs) identifiedfor preferredsystems concept.Systemcharacteristicsand measures tosupport requiredcapabilitiesidentified. Form,fit, and functionconstraintsidentified, andmanufacturingcapabilitiesidentified forpreferred systemconcepts.Should beassessed atTRL 5Lower levelperformancerequirementssufficient toproceed topreliminarydesign. Allenabling/criticaltechnologiesand componentsidentifiedand product lifecycle considered.Evaluationof designKCs initiated.Product datarequired forprototypecomponentmanufacturingreleased.Should beassessed atTRL 6System allocatedbaseline established.Productrequirements andfeatures are wellenough defined tosupport preliminarydesign review.Product dataessential forsubsystem/systemprototyping hasbeen released.Preliminary designKCs have beenidentified andmitigation plan indevelopment.Should beassessed atTRL 7Product designand featuresare defined wellenough to supportCDR eventhough designchange trafficmay be significant.All productdataessential forcomponentmanufacturinghas beenreleased.Potential KCrisk issues havebeen identifiedand mitigationplan is in place.Should beassessedat TRL 7Detaileddesign ofproductfeaturesand interfacesiscomplete.All productdata essentialfor systemmanufacturinghasbeenreleased.Designchangetraffic doesnot significantlyimpactLRIP. KCsare attainablebasedupon pilotline demonstrations.Should beassessedat TRL 8Majorproductdesignfeaturesand configurationare stable.Systemdesign hasbeen validatedthroughoperationaltesting ofLRIPitems.PCA orequivalentcompleteas necessary.Designchangetraffic islimited. AllKCs arecontrolledin LRIP toappropriatequalitylevels.Should beassessedat TRL 9Productdesign isstable.Designchangesare fewand generallylimited tothoserequiredfor continuousimprovementor inreaction toobsolescence. AllKCs arecontrolledin FRP toappropriatequalitylevels.A-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!