12.07.2015 Views

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A-8. <strong>Manufacturing</strong> <strong>Readiness</strong> <strong>Level</strong>s for the Facilities ThreadAcquisitionPhasePre-MSA MSA TD EMD LRIP FRPTechnical Reviews – ASR SRR/SFR PDR CDRThreadSub-Thread– TechnologyMaturityH – FacilitiesH.1 – Tooling/STE/SIEH.2 – Facilities<strong>MRL</strong> 1 <strong>MRL</strong> 2 <strong>MRL</strong> 3 <strong>MRL</strong> 4 <strong>MRL</strong> 5 <strong>MRL</strong> 6 <strong>MRL</strong> 7 <strong>MRL</strong> 8 <strong>MRL</strong> 9Should beassessedat TRL 1Should beassessed atTRL 2Should beassessed atTRL 3Should beassessed at TRL4– – – Tooling/STE/SIErequirements areconsidered as partof AoA.– – Specializedfacility requirements/needsidentified.Availability ofmanufacturingfacilities forprototype developmentand productionevaluatedas part of AoA.Should beassessed atTRL 5Identify toolingand STE/SIErequirementsand providesupportingrationale andschedule.<strong>Manufacturing</strong>facilities identifiedand plansdeveloped toproduce prototypes.Should beassessed atTRL 6Prototype toolingand STE/SIEconceptsdemonstrated inproduction relevantenvironment.Production toolingand STE/SIErequirementsdeveloped.<strong>Manufacturing</strong>facilities identifiedand plans developedto producepilot line build.Should beassessed atTRL 7Productiontooling andSTE/SIE designand developmenteffortsunderway.<strong>Manufacturing</strong>equipmentmaintenancestrategydeveloped.<strong>Manufacturing</strong>facilitiesidentified andplans developedto produceLRIPbuild.PRR/SVRShould beassessedat TRL 7Tooling,test, andinspectionequipmentproven onpilot lineandadditionalrequirementsidentifiedforLRIP.<strong>Manufacturing</strong>equipmentmaintenancedemonstratedonpilot line.Pilot linefacilitiesdemonstrated.<strong>Manufacturing</strong>facilitiesadequatetobegin LRIP.Plans inplace tosupporttransition toFRP.PCA –Should beassessedat TRL 8All tooling,test, andinspectionequipmentproven inLRIP andrequirementsidentifiedfor FRP.<strong>Manufacturing</strong>equipmentmaintenancescheduledemonstrated.<strong>Manufacturing</strong>facilities inplace anddemonstratedinLRIP.Capacityplans adequatetosupportFRP.<strong>MRL</strong> 10Should beassessedat TRL 9Proventooling,test, andinspectionequipmentin place tosupportmaximumFRP.Plannedequipmentmaintenancescheduleachieved.Productionfacilities inplace andcapacitydemonstratedtomeet maximumFRPrequirements.A-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!