12.07.2015 Views

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table A-9. <strong>Manufacturing</strong> <strong>Readiness</strong> <strong>Level</strong>s for the <strong>Manufacturing</strong> Management ThreadAcquisitionPhasePre-MSA MSA TD EMD LRIP FRPTechnical Reviews – ASR SRR/SFR PDR CDRThreadI – <strong>Manufacturing</strong> ManagementSub-Thread– TechnologyMaturityI.1 – <strong>Manufacturing</strong> Planning & SchedulingI.2 – Materials Planning<strong>MRL</strong> 1 <strong>MRL</strong> 2 <strong>MRL</strong> 3 <strong>MRL</strong> 4 <strong>MRL</strong> 5 <strong>MRL</strong> 6 <strong>MRL</strong> 7 <strong>MRL</strong> 8 <strong>MRL</strong> 9Should beassessedat TRL 1Should beassessed atTRL 2Should beassessed atTRL 3Should beassessed at TRL4– – – <strong>Manufacturing</strong>strategy developedand integratedwith acquisitionstrategy.Prototype schedulerisk mitigationefforts incorporatedinto TDS.– – – Technologydevelopmentarticle componentlist developed withassociated leadtimeestimates.Should beassessed atTRL 5<strong>Manufacturing</strong>strategy refinedbased uponpreferred concept.Prototypeschedule riskmitigationefforts initiated.Technologydevelopmentpart listmaturing.Make/buyevaluationsbegin andincludeproductionconsiderationsreflecting pilotline, LRIP, andFRP needs.Lead times andother risksidentified.Should beassessed atTRL 6Initial manufacturingapproachdeveloped. Allsystem-designrelatedmanufacturingeventsincluded in IMP/IMS. <strong>Manufacturing</strong>risk mitigationapproach for pilotline or technologyinsertion programsdefined.Most material decisionscomplete(make/buy),material risksidentified, andmitigation plansdeveloped. BOMinitiated.Should beassessed atTRL 7Initial manufacturingplandeveloped.<strong>Manufacturing</strong>planningincluded in theIMP/IMS.<strong>Manufacturing</strong>risks integratedinto risk mitigationplans.Develop initialworkinstructions.Effectiveproductioncontrol systemin place tosupport pilotline.Make/buydecisions andBOM completefor pilot linebuild. Materialplanning systemsin placefor pilot linebuild.PRR/SVRShould beassessedat TRL 7<strong>Manufacturing</strong>planupdated forLRIP. Allkeymanufacturingrisksare identifiedandassessedwithapprovedmitigationplans inplace. Workinstructionsfinalized.Effectiveproductioncontrolsystem inplace tosupportLRIP.Make/buydecisionsand BOMcomplete tosupportLRIP.Materialplanningsystemsproven onpilot line forLRIP build.PCA –Should beassessedat TRL 8<strong>Manufacturing</strong>planupdatedfor FRP.Allmanufacturingriskstrackedand mitigated.Effectiveproductioncontrolsystem inplace tosupportFRP.Make/buydecisionsand BOMcompleteto supportFRP.Materialplanningsystemsproven inLRIP andsufficientfor FRP.<strong>MRL</strong> 10Should beassessedat TRL 9All manufacturingrisksmitigated.Materialplanningsystemsvalidatedon FRPbuild.A-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!