12.07.2015 Views

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

Manufacturing Readiness Level (MRL) Deskbook

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table A-7. <strong>Manufacturing</strong> <strong>Readiness</strong> <strong>Level</strong>s for the <strong>Manufacturing</strong> Personnel ThreadAcquisitionPhasePre-MSA MSA TD EMD LRIP FRPTechnical Reviews – ASR SRR/SFR PDR CDRThreadSub-Thread– TechnologyMaturityG – Mfg Workforce (Engineering & Production)G.1 – Mfg Workforce (Engineering & Production)PRR/SVRPCA –<strong>MRL</strong> 1 <strong>MRL</strong> 2 <strong>MRL</strong> 3 <strong>MRL</strong> 4 <strong>MRL</strong> 5 <strong>MRL</strong> 6 <strong>MRL</strong> 7 <strong>MRL</strong> 8 <strong>MRL</strong> 9 <strong>MRL</strong> 10Should beassessedat TRL 1Should beassessed atTRL 2Should beassessed atTRL 3– – New manufacturingskillsidentified.Should beassessed at TRL4<strong>Manufacturing</strong>skill sets identifiedand productionworkforce requirements(technicaland operational)evaluated as partof AoA.Availability ofprocess developmentworkforcefor theTechnologyDevelopmentPhasedetermined.Should beassessed atTRL 5Skill setsidentified andplans developedto meetprototype andproductionneeds. Specialskills certificationand trainingrequirementsestablished.Should beassessed atTRL 6<strong>Manufacturing</strong>workforce skillsavailable forproduction in arelevant environment.Identifyresources (quantitiesand skill sets)and develop initialplans to achieverequirements forpilot line andproduction.Should beassessed atTRL 7<strong>Manufacturing</strong>workforceresourcerequirementsidentified forpilot line. Plansdeveloped toachieve pilotline requirements.Plansupdated toachieve LRIPworkforcerequirements.Pilot line workforcetrained inproductionrepresentativeenvironment.Should beassessedat TRL 7<strong>Manufacturing</strong>workforceresourcerequirementsidentifiedforLRIP. Plansdevelopedto achieveLRIPrequirements.Plansupdated toachieveFRPworkforcerequirements.LRIPpersonneltrained onpilot linewherepossible.Should beassessedat TRL 8LRIPpersonnelrequirementsmet.Implementplan toachieveFRPworkforcerequirements.Should beassessedat TRL 9FRPpersonnelrequirementsmet.Productionworkforceskill setsmaintainedinresponseto attritionofworkforce.A-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!