13.07.2015 Views

Non binding guide to good practice for implementing Directive

Non binding guide to good practice for implementing Directive

Non binding guide to good practice for implementing Directive

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FIGURE D.2 HAND-ARM VIBRATION EXPOSURE NOMOGRAM<strong>Non</strong> <strong>binding</strong> <strong>guide</strong> <strong>to</strong> <strong>good</strong> <strong>practice</strong> <strong>for</strong> <strong>implementing</strong> <strong>Directive</strong> 2002/44/EC (Vibrations at Work)Weightedaccelerationa hv(m/s 2 )4030201510865432PartialVibrationExposureA i(8)(m/s 2 )Exp. Limit Value 5 m/s 2Exp. Action Value 2.5 m/s 24030201510864321.51.00.80.60.50.40.30.216008004002001005025168421VibrationExposurePointsn iHours108654321.51.00.80.60.5DailyExposureTimeT1008060403020151086543Minutes1.51.00.80.60.50.1Instructions:For each exposure, draw a line between the weighted acceleration and the exposure time.Read off either the partial vibration exposure A(8) i, or the exposure points n i, from the pointwhere the line crosses the centre scale. Enter the values in the appropriate table below.For A(8)i values:Square and add the A(8) ivaluesSquare-root the result <strong>to</strong> give the dailyvibration exposure A(8).A i(8)A i(8) 2Exposure 1 Exposure 1Exposure 2 Exposure 2Exposure 3 Exposure 3Exposure 4 Exposure 4Exposure 5 Exposure 5∑A i(8) 2 = n = ∑n i=For n ivalues:Add the score values <strong>to</strong> give a <strong>to</strong>taldaily points, nUse the centre scale <strong>to</strong> convertthe n value <strong>to</strong> A(8)n i2140A(8) = ∑A i(8) 2 = A(8) =

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!