4. Installation ProceduresChain idlersupport bracketsFigure 4C8. Put main frame on saw horses (two (2) pieces), as shown in Figure 4C. Then space about 11-1/2"apart with angle flanges outward. Be sure chain idler support brackets are on the same end.9. Place inboard pivot end over main frame as shown in Figure 4D. Be sure inboard pivot is on thesame end of the frame as chain idler support brackets. (See Figure 4F on Page 18.) Have the heavyelectric cords coming out of the center pivot on the same side as the loops on the main frame. Theseloops hold the heavy cords in place.NOTE: Large loops for both rubber covered cords, small loops on opposite end of frame for14-3 cord only.Using two (2) 3/8" x 1" hex head bolts, place flat washer onto bolt, put bolt through yoke and frameand secure with lock washer and nut on inside of frame angle (two (2) on each side). Using two (2)3/8" x 1" hex head bolts for 4 auger machine (two (2) 3/8" x 2" hex head bolts for 6 auger machine),bring bolts up from the bottom of the main frame through yoke and secure with flat washer,lock washer and nuts (two (2) on each side). (See Figure 4D or Page 54.)Figure 4DPNEG-1358 <strong>Red</strong> <strong>Giant</strong> <strong>Grain</strong> <strong>Stir</strong>-<strong>Ator</strong> 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!