13.07.2015 Views

Concrete Pipe & Box Culvert Installation - Shaw Precast Solutions

Concrete Pipe & Box Culvert Installation - Shaw Precast Solutions

Concrete Pipe & Box Culvert Installation - Shaw Precast Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IV. APPENDIXDEFINITIONSBackfill or Side Fill: the layer of soil placed aroundor above the pipe or box unit.Bedding: the material used to cushion and evenlydistribute the soil reaction at the bottom of thestructure.Bell End: that portion of the end of the pipe or boxunit, regardless of its shape or dimensions,which overlaps a portion of the end of the adjoiningpipe or box culvert.<strong>Box</strong> <strong>Culvert</strong>/Section: A culvert with a rectangularcross section<strong>Concrete</strong>: a homogeneous mixture of Portland cement,fine aggregate, coarse aggregate, andwater. The mixture may also contain admixtures,or other cementitious materials, or both.<strong>Culvert</strong>: a pipeline or box intended to convey waterunder a highway, railroad, canal, or similarfacility.External Sealing Bands: flexible wrappings thatare applied to the outside of a concrete pipe,box section, or manhole section joint intendedto control the movement of fluids or solidsthrough the joint.Gradation: the distribution of particles of granularmaterial among standard sizes usually expressedin terms of cumulative percentageslarger or smaller than each of a series of sieveopenings.Handling Reinforcement: reinforcement intendedto reduce the risk of collapse of the pipe or sectionduring handling or storage prior to and duringfinal placement.Infiltration: the volume of groundwater entering aAmerican <strong>Concrete</strong> <strong>Pipe</strong> Association • www.concrete-pipe.org 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!