13.07.2015 Views

Yeoman CL - The Stove Yard

Yeoman CL - The Stove Yard

Yeoman CL - The Stove Yard

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PRE-INSTALLATION CHECKS1. FlueModel<strong>Yeoman</strong> <strong>CL</strong>3 - YM-<strong>CL</strong>3MF<strong>Yeoman</strong> <strong>CL</strong>5 - YM-<strong>CL</strong>5W / YM-<strong>CL</strong>5MF<strong>Yeoman</strong> <strong>CL</strong>8 - YM-<strong>CL</strong>8W / YM-<strong>CL</strong>8MF<strong>Yeoman</strong> <strong>CL</strong>3<strong>Yeoman</strong> <strong>CL</strong>5<strong>Yeoman</strong> <strong>CL</strong>8Flue / Chimney SizeFlue / Chimneyminimum height*Without Liner SystemRound (diameter)Without Liner System (square)Minimum DimensionWith Liner or Factory MadeSystem (diameter)mm 150 150 150inch 6 6 6mm 135 135 135inch 5½ 5½ 5½mm ‡150 150 150mm ‡6 6 6m 4 4 4feet 13 13 13*When measured from the top of the flue, with no horizontal sections and a maximum of 4 bends with angles of less than 45°‡May be 125mm (5") if burning low volatiles (smokeless) fuels approved for use in Smoke Control Areas.See web site http://uksmokecontrolareas.co.uk for more information about approved fuels.2. VENTILATION2.1 This appliance requires a constant supply of air to maintainproper combustion and effective flue performance.2.2 An inadequate air supply can result in poor combustion andsmoke entering the room which is potentially dangerous.2.3 This supply of air can come from either:—<strong>The</strong> natural leakage of air into the room in which theproduct is fitted.—Purpose provided ventilation.—Some Stovax appliances can also be fitted with anoptional outdoor air kit which allows air to be drawn infrom the outside.Modern building techniques have reduced the amount of airthat leaks in or out of a house. A modern construction withan air tightness of less than 5m 3 per hour per m 2 requires anair vent for ALL solid fuel appliances including those with arated heat output of less than 5kW.NOTE: <strong>The</strong> air leakage of a modern house is tested at thecompletion of construction and a certificate issued confirmingthis.2.4 <strong>The</strong> amount of air required must comply with local buildingregulations and the rules in force.2.5 If spillage is detected during commissioning then there maybe insufficient natural ventilation and an additional air supplywill be necessary.2.6 Many older buildings are sufficiently ventilated by naturalleakage of air to provide suitable air supply for an applianceof 5kW output or less.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!