13.07.2015 Views

FIMS Media SOA Framework - AMWA

FIMS Media SOA Framework - AMWA

FIMS Media SOA Framework - AMWA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FIMS</strong> <strong>Media</strong> <strong>SOA</strong> <strong>Framework</strong> Phase1 (Preliminary)- resume: resume a job from a paused state.- restart: restart a job from the beginning.- terminate: terminate a job.- cleanup: remove all the data related to a job.- modifyJob: modifies the priority or the profile of a job.8.2.2.2.1.2.2 ModifyJobTypeThis type provides a choice for modifying the settings for the current job. It allows modifying the priority or theprofile.8.2.2.2.1.2.2.1 ParametersParameter Type DescriptionPriority PriorityType This choice element shall be set to the value of the newpriority.Profile BaseProfileType This choice element shall be set to the value of the newprofile. For example, a modified profile might changeresource utilization settings for the current job.8.2.2.2.1.2.3 JobIDTypeThis type provides the information on the jobGUID and the service provider job ID (local job ID).8.2.2.2.1.2.3.1 ParametersParameter Type DescriptionjobGUID xsd:string The globally unique identifier (GUID) for the job requestserviceProviderJobID xsd:string The service provider job ID. If the service providergenerates its own job ID associated with a job request,this field must be set. Otherwise, the service provider canuse the supplied jobGUID.8.2.2.2.2 ManageJobResponseTypeThis type provides job information as a response to a job management request (e.g. pausing a job orrequesting the job status). Furthermore, the response message provided by this type supports a pollinginteraction pattern for retrieving the status and the response of an asynchronous job request. The client canquery the status using the manage job request and can retrieve the result of the job, upon completion orfailure, using the jobResult element in this type.Private committee documentWorking Draft for review by <strong>FIMS</strong> Rev v1, Nov-16-2010 Page 58 of 89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!