13.07.2015 Views

Energy Top Range - Brochure - Ferroli

Energy Top Range - Brochure - Ferroli

Energy Top Range - Brochure - Ferroli

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENERGY TOP B/BK> > > Heating division> SPECIFICATIONSFLUE GAS EVACUATION> EXAMPLE OF “BACK-TO-BACK” CONFIGURATION The table shows some “back-to-back” cascading combinations and the relative maximumoverall dimensions. The corresponding diameter of the flue gas outlet manifold is also shown for each combination.HEATINPUTkWHEATOUTPUT80/60°CkWNR.MODULES191 187,2 2266 260,7 2307 300,9 2348 341,1 2382374,4 2416 407,7 3464 454,8 2498 488,1 3539 528,3 3580 568,5 3614 601,8 3696 682,2 3730 715,5 4771 755,7 4812 795,9 4846 829,2 4928 909,6 41003 983,1 51044 1023,3 51078 1056,6 51160 1137 51LAYOUT OF “BACK-TO-BACK”MODULES1 3 52 4 680 - -125 - -125 - -160 - -80 - -250 - -125 - -250 - -160 - -250 - -160 125 -160 - -250 - -250 - -160 125 -250 - -250 80 -250 - -250 125 -250 - -160 250 -250 - -250 250 -250 - -160 125 -250 250 -250 80 -250 250 -250 125 -250 250 -160 250 -250 250 -250 250 -250 250 -250 250 80250 250 -250 250 125250 250 -250 250 160250 250 -250 250 250250 250 -CASCADE DIMENSIONSmmWIDTH500DEPTHFLUE GASMANIFOLDDIAMETERmm2001000 2001000 2001000 2001000 2001500 2001000 2001500 3001500 2001500 3002000 900 3002000 3002000 3002000 3002000 3002000 3002000 3002500 3002500 3003000 3003000 30023code 041019X0 (ø 200 mm)code 041036X0 (ø 300 mm)1m MF manifold extension pipe, PPs5code 041030X0 (ø 200 mm)code 041031X0 (ø 300 mm)Flue gas manifold kit, grey PPs (L=600mm),double connection for “back-to-back” cascadingconfigurations, complete with bends, clapet valves,vertical connections, gaskets and bracketsPS. To be used per each pair of fluesoutlets (each pair of furnace) installed inback-to-back layout45564code 041016X0 (ø 200 mm)code 041035X0 (ø 300 mm)MF 90° bend, PPs6code 041026X0 (ø 200 mm)code 041027X0 (ø 300 mm)Condensate drain trap kit for flue gasmanifolds complete with fasteningbracketsPS. Use one for each cascade system7code 0M600MX0Cabinet complete with hydraulicseparator and safety devices (excludingsafety valve)TOP VIEWcode 042026X0code 042027X01code 042026X0Flange kit for cascading configurationwith “back-to-back” boilers2code 042027X0Flange kit, containing: 3 blind flanges, 3drilled flanges, gaskets119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!