PDF - Pella.com
PDF - Pella.com
PDF - Pella.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The performance of any building is dependent upon the design, installation, and workmanshiparchitect, contractor or structural engineer prior to installation of <strong>Pella</strong> products.The individual (building owner, architect, contractor, installer and/or consumer) responsible for theproject must take into account local conditions, building codes, inherent <strong>com</strong>ponent limitations,the effects of aging and weathering on building <strong>com</strong>ponents, and other design issues relevant toeach project.The determination of the suitability of all building <strong>com</strong>ponents for each project, as well as thedesign and installation of flashing and sealing systems, are the responsibility of the building owner,architect, contractor, installer and/or consumer.YOU WILL NEED TO SUPPLY:(Performance Upgrade & HurricaneShield) ® SmartFlash foil backed butyl window anddoor flashing tape or equivalent Window and Door Insulating FoamSealant by the Dow Chemical Company or equivalentlow pressure polyurethane window and doorInstallation Clip Option:TOOLS REQUIRED:and small flat blade)(Architect Series ® )(Designer Series ® )concrete applications1 ROUGH OPENING PREPARATION:A. Confirm the opening is plumb and level.Note: It is critical the bottom is level.