13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong><strong>2008</strong>-<strong>09</strong> 20<strong>09</strong>-10 <strong>2010</strong>-<strong>11</strong>(B) Sale <strong>to</strong> other licenseeCESC 1500.00 1500.00 1500.00DPL 50.00 0.00 0.00DPSCL 60.00 60.00 60.00Sub-<strong>to</strong>tal( B ) 1610.00 1560.00 1560.00( C )Sale <strong>to</strong> person other than licenseeor any other consumerSIKKIM 46.00 46.00 46.00Outside region 4648.00 6<strong>11</strong>1.00 5502.00Sub-<strong>to</strong>tal( C ) 4694.00 6157.00 5548.00All Fig. inMUGrand Total ( A + B + C ) 19674.00 23182.00 24432.002.2. Sale <strong>to</strong> other licensee2.2.1. In terms of the rights and liabilities of WBSEB transferred <strong>to</strong> <strong>WBSEDCL</strong> with effectfrom 01.04.2007, <strong>WBSEDCL</strong> is continuing <strong>to</strong> supply <strong>to</strong> CESC LTD. at four ( 04) differentpoints as per agreement executed between CESC and WBSEB. On the basis of presenttrend of drawal by CESC Ltd., the consumption of CESC Ltd has been estimated at 1500MU every year during the years <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong>.2.2.2. In the tariff order dated 08.05.2006 Hon’ble Commission considered the drawal ofpower by DPSC Ltd from WBSEB at 33 KV at Bankola point as sale <strong>to</strong> DPSC Ltd. Thedrawal of power by DPSCL at Bankola has been estimated at 60 MU every year andconsidered as sale <strong>to</strong> DPSC Ltd. during the years <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong>. Whileestimating the sale <strong>to</strong> DPSC, their request for enhanced load at Bankola point has beenconsidered.2.2.3. In terms of an Agreement signed between Govt. of West Bengal and Govt. ofSikkim, the Board will have <strong>to</strong> make 20% of the sent out generation <strong>to</strong> Govt. of Sikkimfrom Rammam Hydel Station Stage-II at sent out cost of generation of the said PowerWest Bengal State Electricity Distribution Company Ltd. 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!